Authorized purposes for the Eau Galle Lake Project include flood control recreation, and enhancement of fish and wildlife. Eau Galle Lake is located on the Eau Galle River immediately upstream of Spring Valley, Wisconsin, approximately 50 miles east of the Twin Cities of Minnesota.
Published: 2/26/2015
The Section 154 program authorizes the U.S. Army Corps of Engineers to provide assistance to northern Wisconsin public entities in the form of design, construction and reconstruction assistance for water-related environmental infrastructure, resource protection and development projects. These include navigation and inland harbor improvement and expansion, wastewater treatment and related facilities, water supply and related facilities, environmental restoration, and surface water resource protection and development.
Published: 10/2/2015
The basic objectives of the Levee Safety Program are to develop balanced and informed assessments of levees within the program; evaluate, prioritize and justify levee safety decisions; and recommend improvements to public safety associated with levee systems. The Corps created the National Levee Database, inventoried all levees in the program and improved inspection procedures.
Published: 2/26/2015
Locks and Dams (LD) 2 through 10 have used the same miter gates since their construction in the 1930s. Over time, the gates have been damaged and distressed, which has led to serviceability and safety issues. This project will replace the gates and the anchorages system, increasing navigational longevity and operational readiness while decreasing repair costs and downtime due to maintenance or failure. Upper Mississippi Locks and Dams 2 through 10.
Published: 9/25/2017
The tow rail system is integral to the operation of each of the Mississippi River Locks and Dams 2 through 10. It is attached to the top of the lock guidewall and helps guide tows through the lock chamber. Each system is comprised of an operating unit, rail and traveling kevel or “mule.” The Locks and Dams 2 through 10 tow rail systems have been deteriorating over the past several years, requiring rehabilitation of these systems.
Published: 3/14/2016
Maintenance of the dam spillway gates are required to avoid degradation and eventual replacement. Benefit – cost analyses show it is economically favorable to maintain the gates rather than the replacement option. There are also reliability and safety concerns with allowing the gates to degrade to the point that they must be replaced. formed on site.
Published: 2/26/2015
The Tribal Partnership Program (TPP) provides authority for the U.S. Army Corps of Engineers to utilize TPP to perform water-related planning activities and activities related to the study, design and construction of water resources development projects located primarily on tribal lands that substantially benefit federally-recognized tribes. To start the process, a tribe submits a study request to the U.S. Army Corps of Engineers. The Corps evaluates the request, and if viable, the Corps works with the tribe to determine a scope of work and enters into a feasibility cost sharing agreement (FCSA). Following the execution of the FCSA, the Corps seeks federal funding for the study.
Published: 9/25/2017
The purpose of the project is to stop erosion along tribal lands on the southeast side of the lake while enhancing access to the water for cultural practices. Fed by groundwater, Big Sand Lake is a clear, soft water lake that has varying levels of algae growth within the year, affecting lake health. The lake, located in Burnett County, Wisconsin, is typically 1,434 surface acres with a maximum depth of 55 feet.
Published: 10/1/2018