Minnesota Congressional District 2 projects and studies

Aquatic Ecosystem Restoration: Section 206, Painter Creek, Hennepin County, Minnesota

Painter Creek is part of the Minnehaha Creek Watershed District (MCWD), which includes part of the city of Minneapolis, Minnesota, and its western and northwestern suburbs. The Painter Creek Subwatershed is 8,667 acres (13.5 square miles) located along the northwestern boundary of the MCWD and includes Painter Creek, Katrina Lake, Thies Lake, large areas of undisturbed or low-density development (including Baker Park Reserve) and numerous wetlands. The project area consists of wetlands connected by Painter Creek flowing through South Katrina Marsh and Painters Marsh, then into Jennings Bay on Lake Minnetonka.
Published: 3/14/2016

Beneficial Use of Dredged Material: Section 1122, Upper Pool 4 – Lake Pepin, Bay City, Wisconsin

This project proposes to utilize dredged material generated from navigation channel dredging to protect and restore backwater habitat; this is a win-win-win project for the U.S. Army Corps of Engineers, our partner agencies and the environment. The Wisconsin Department of Natural Resources is the non-federal sponsor.
Published: 9/16/2016

Dam Bridge & Gate Painting – Lower St. Anthony Falls Through Lock and Dam 10

The project is the routine maintenance, including painting and repair of the dam gates. Phase 1 consisted of report development, including alternatives and life cycle costs. Phase 2 of the project analyzed the alternatives, and decided upon an Indefinite Delivery – Indefinite Quantity (IDIQ) acquisition strategy with maintenance performed on site.
Published: 2/26/2015

Hydropower, FERC Licensing

Granting licensing of a privately-owned hydropower project on federal property. The project is proposed to be located at Upper St. Anthony Falls lock and dam, in Minneapolis, Minnesota.
Published: 2/26/2015

Levee Safety Program: Minnesota

The basic objectives of the Levee Safety Program are to develop balanced and informed assessments of levees within the program; evaluate, prioritize and justify levee safety decisions; and recommend improvements to public safety associated with levee systems. The Corps created the National Levee Database, inventoried all levees in the program and improved inspection procedures. The Corps is developing a method to manage its portfolio of levee systems and is reviewing and revising current levee-related policies and procedures.
Published: 2/26/2015

Lower Pool 4 Dredged Material Management Plan – Wabasha County, Minnesota; Buffalo and Pepin Counties, Wisconsin

The Lower Pool 4 DMMP study area is located between Lock and Dam 4 and the foot of Lake Pepin, river miles 753.0 to 764.0. The study area includes the Minnesota communities in Wabasha County of Lake City, Wabasha, Reads Landing and Kellogg and the Wisconsin communities in Buffalo and Pepin Counties of Nelson, Alma and Buffalo City.
Published: 3/15/2018

Mississippi River Locks and Dams 2–10 Embankment Rehabilitation Adjacent to Structures

Embankment rehabilitation will address restoring embankments to meet current design standards. Overtopping protection adjacent to concrete structures is the first priority for design and construction. No increase in the height of the embankments is planned. Upper Mississippi Locks and Dams 2 through 10.
Published: 2/26/2015

Mississippi River Locks and Dams 2–10 Miter Gates Replacement

Locks and Dams (LD) 2 through 10 have used the same miter gates since their construction in the 1930s. Over time, the gates have been damaged and distressed, which has led to serviceability and safety issues. This project will replace the gates and the anchorages system, increasing navigational longevity and operational readiness while decreasing repair costs and downtime due to maintenance or failure. Upper Mississippi Locks and Dams 2 through 10.
Published: 9/25/2017

Mississippi River Locks and Dams 2–10 Tow Rail System

The tow rail system is integral to the operation of each of the Mississippi River Locks and Dams 2 through 10. It is attached to the top of the lock guidewall and helps guide tows through the lock chamber. Each system is comprised of an operating unit, rail and traveling kevel or “mule.” The Locks and Dams 2 through 10 tow rail systems have been deteriorating over the past several years, requiring rehabilitation of these systems.
Published: 3/14/2016

Navigation and Ecosystem Sustainability Program (NESP)

The Navigation and Ecosystem Sustainability Program (NESP), seeks to provide a safe, reliable, cost effective and environment sustainable waterborne navigation system by implementing switchboats at five locks, constructing mooring cells and seven new 1,200 foot locks. NESP will restore the aquatic and terrestrial habitat to a more natural condition on more than 100,000 acres throughout the system through a wide variety of ecosystem projects.
Published: 3/5/2020

Pool 2 Dredged Material Management Plan – Hennepin, Ramsey, Dakota and Washington Counties, Minnesota

The purpose of the Dredged Material Management Plan (DMMP) is to prepare a coordinated long-term plan for managing dredged material in Pool 2. This plan was initiated due to increases in dredging volumes throughout Pool 2. Furthermore, three temporary dredged material placement sites need to be excavated in Lower Pool 2.
Published: 3/15/2018

Pool 2 Wing Dam Modification Project, Upper Mississippi River Pool 2, Minnesota

This project will notch a series of wing dams throughout Pool 2 in order to improve main channel border habitat for fishes. Wing dam notching will enable downstream scouring, which creates overwintering habitat. The project area is in the middle and lower half of Pool 2, Upper Mississippi River, downstream of St. Paul, Minnesota; spanning Dakota, Ramsey and Washington counties, Minnesota.
Published: 11/24/2020

Tribal Partnership Program

The Tribal Partnership Program (TPP) provides authority for the U.S. Army Corps of Engineers to utilize TPP to perform water-related planning activities and activities related to the study, design and construction of water resources development projects located primarily on tribal lands that substantially benefit federally-recognized tribes. To start the process, a tribe submits a study request to the U.S. Army Corps of Engineers. The Corps evaluates the request, and if viable, the Corps works with the tribe to determine a scope of work and enters into a feasibility cost sharing agreement (FCSA). Following the execution of the FCSA, the Corps seeks federal funding for the study.
Published: 9/25/2017

Tribal Partnership Program: Sturgeon Lake

The purpose of the project is to address sedimentation, erosion and degradation of culturally significant habitat on Prairie Island Indian Community’s tribal land in Sturgeon Lake. Priority objectives identified in the feasibility study, which will be carried forward in the design and implementation phase are to: (1) reduce shoreline erosion on the Buffalo Slough Island; and (2) improve/restore floodplain forest habitat on Buffalo Slough Island.
Published: 3/20/2018

Upper Mississippi River - Illinois Waterway System Navigation and Ecosystem Sustainability Program (NESP)

Navigation and Ecosystem Sustainability Program (NESP) is a long-term program of ecosystem restoration and navigation improvements for the Upper Mississippi River System (UMRS). NESP will improve system capacity and reduce commercial traffic delays through construction of seven new 1,200-foot locks, mooring cells, and switchboat implementation.
Published: 12/2/2020

Upper Mississippi River 9-Foot Channel Navigation Project Locks and Dams, Minnesota/Wisconsin/Iowa

The U.S. Army Corps of Engineers, St. Paul District is responsible for maintaining 244 miles of the Upper Mississippi River 9-foot channel navigation system from Minneapolis, Minnesota, to Guttenberg, Iowa. The Upper Mississippi River 9-Foot Channel Navigation Project is located in or contiguous to Minnesota, Wisconsin, and Iowa. The navigation project within the St. Paul District includes 13 locks and dams that are operated and maintained by the Corps. In addition to the locks and dams, the project includes channel maintenance, recreation and natural resource activities.
Published: 2/27/2015

Upper Mississippi River 9-Foot Channel Navigation Project Maintenance Minnesota/Wisconsin/Iowa

The U.S. Army Corps of Engineers is responsible for maintaining a 9-foot navigation channel as an important component to the inland navigation system. The St. Paul District (MVP) is responsible for maintaining 244 miles of the Upper Mississippi River 9-Foot Channel Navigation Project from the head of navigation at Minneapolis, Minnesota, to Guttenberg, Iowa. The navigation project also includes the lower navigable portions of the Minnesota, St. Croix, and Black Rivers.
Published: 2/26/2015