Minnesota Congressional District 3 projects and studies

Beneficial Use of Dredged Material: Section 1122, Upper Pool 4 – Lake Pepin, Bay City, Wisconsin

This project proposes to utilize dredged material generated from navigation channel dredging to protect and restore backwater habitat; this is a win-win-win project for the U.S. Army Corps of Engineers, our partner agencies and the environment. The Wisconsin Department of Natural Resources is the non-federal sponsor.
Published: 9/16/2016

Dam Bridge & Gate Painting – Lower St. Anthony Falls Through Lock and Dam 10

The project is the routine maintenance, including painting and repair of the dam gates. Phase 1 consisted of report development, including alternatives and life cycle costs. Phase 2 of the project analyzed the alternatives, and decided upon an Indefinite Delivery – Indefinite Quantity (IDIQ) acquisition strategy with maintenance performed on site.
Published: 2/26/2015

Disposition Study, Upper St. Anthony Falls and Lock and Dam, Upper Mississippi River

Determine whether or not continued operation and ownership of Upper St. Anthony Falls Lock and Dam (USAF) is in the federal interest, and if not, provide supporting information for deauthorization of the project purposes and disposal of the property. USAF is located on the Mississippi River in Minneapolis, Minnesota.
Published: 3/14/2016

Upper Mississippi River 9-Foot Channel Navigation Project Maintenance Minnesota/Wisconsin/Iowa

The U.S. Army Corps of Engineers is responsible for maintaining a 9-foot navigation channel as an important component to the inland navigation system. The St. Paul District (MVP) is responsible for maintaining 244 miles of the Upper Mississippi River 9-Foot Channel Navigation Project from the head of navigation at Minneapolis, Minnesota, to Guttenberg, Iowa. The navigation project also includes the lower navigable portions of the Minnesota, St. Croix, and Black Rivers.
Published: 2/26/2015