Contact

U.S. Army Corps of Engineers
St. Paul District
Programs & Project Management

332 Minnesota St., Suite E1500
St. Paul, MN 55101

(651) 290-5755

cemvp-pm@usace.army.mil

Results:
Tag: Big Lake
Clear
  • April

    Upper Mississippi River Restoration Project Big Lake, Pool 4, Wisconsin

    As with the much of the upper Mississippi River, sedimentation of backwater areas is an ongoing issue. The project area is greatly influenced by the input of sand from the Chippewa River that enters Pool 4 at about river mile 764. Other potential sources of sand are the historic channel maintenance dredging side-cast islands and the four active temporary placement sites within the study area. Big Lake has lost much of its island complex and bottomland forest to wind and wave erosion. The barrier islands between the lake and Catfish Slough have been degraded and/or eliminated over the past several years.