Contact

U.S. Army Corps of Engineers
St. Paul District
Programs & Project Management

332 Minnesota St., Suite E1500
St. Paul, MN 55101

(651) 290-5755

cemvp-pm@usace.army.mil

Results:
Tag: Red River Basin
Clear
  • April

    Planning Assistance to States: Red River Basin Comprehensive Study

    The purpose of this study is to investigate the effectiveness of various flood risk reduction measures basin-wide to reduce main stem peak flows by 20% for the larger rare events such as the 0.5% (200-year) and 0.2% (500-year) chance of exceedance floods.
  • Planning Assistance to States: Red River Basin Long-Term Flood Study

    The purpose of this study was to investigate the effectiveness of various flood risk reduction measures basin-wide to reduce main stem peak flows by 20% for the larger rare events such as the 0.5% (200-year) and 0.2% (500-year) chances of exceedance floods.