Contact

U.S. Army Corps of Engineers
St. Paul District
Programs & Project Management

332 Minnesota St., Suite E1500
St. Paul, MN 55101

(651) 290-5755

cemvp-pm@usace.army.mil

Results:
Tag: RRN
Clear
  • March

    Planning Assistance to States: Red River Basin Long Term Flood Study

    The purpose of this study is to investigate the effectiveness of various flood risk reduction measures basin wide to reduce main stem peak flows by 20% for the larger rare events such as the 0.5% (200-year) and 0.2% (500-year) chance of exceedance floods.
  • February

    Red River of the North Comprehensive Watershed Management Plan

    The Red River of the North basin is an international, multi-jurisdictional watershed of 45,000 square miles, with 80 percent of the basin lying in the United States and 20 percent in Manitoba, Canada. Eighteen Minnesota counties and 22 North Dakota counties lie wholly or partially in the basin. The river flows to the north, bringing water and nutrients to Lake Winnipeg in Manitoba. Flooding and loss of native habitat are significant issues in the Red River basin.