Contact

U.S. Army Corps of Engineers
St. Paul District
Programs & Project Management

332 Minnesota St., Suite E1500
St. Paul, MN 55101

(651) 290-5755

cemvp-pm@usace.army.mil

Results:
Tag: Dredged Material Management Plans
Clear
  • April

    Dredged Material Management Plan: Pool 10, Wisconsin/Iowa

    The purpose of the Pool 10 Dredged Material Management Plan is to prepare a coordinated, long-term plan for managing dredged material in Pool 10. This plan was initiated due to needs for dredged material management at upland placement sites, especially in the downstream reach of the pool.
  • Dredged Material Management Plan: Pool 3 and Upper Pool 4, Minnesota and Wisconsin

    The U.S. Army Corps of Engineers operates and maintains the Upper Mississippi River 9-Foot Channel Navigation Project, and one method the U.S. Army Corps of Engineers uses to keep the channel the right size is dredging river soils or “material.” The purpose of the Dredged Material Management Plan is to prepare a coordinated, long-term plan for managing dredged material in Pool 3 and Upper Pool 4. This plan was initiated due to needs for dredged material management upland placement sites.
  • Dredged Material Management Plan: Pool 9, Minnesota/Wisconsin/Iowa

    The U.S. Army Corps of Engineers operates and maintains the Upper Mississippi River 9-Foot Channel Navigation Project, and one method used to maintain the 9-foot channel is dredging river soils or “material.” The purpose of the Pool 9 Dredged Material Management Plan is to prepare a coordinated long-term plan for managing dredged material in Pool 9. This plan was initiated due to needs for dredged material management at upland placement sites, especially in the upstream reach of the pool.