Results:
Tag: Upper Mississippi River 9-Foot
Clear
  • March

    Fountain City Service Base Sustainment & Modernization

    The Fountain City Service Base (FCSB) Sustainment and Modernization Project is a two-phase project to improve the function and safety throughout the service base. The two objectives of the project are to replace the deteriorated mooring dolphins on the west side of the Fountain City harbor channel and modernize the service base. The project is located at the Fountain City Services Base in Pool 5 of the Upper Mississippi River, in Fountain City, Wisconsin.
  • February

    Upper Mississippi River 9-Foot Channel Navigation Project Maintenance Minnesota/Wisconsin/Iowa

    The U.S. Army Corps of Engineers is responsible for maintaining a 9-foot navigation channel as an important component to the inland navigation system. The St. Paul District (MVP) is responsible for maintaining 244 miles of the Upper Mississippi River 9-Foot Channel Navigation Project from the head of navigation at Minneapolis, Minnesota, to Guttenberg, Iowa. The navigation project also includes the lower navigable portions of the Minnesota, St. Croix, and Black Rivers.