Contact

U.S. Army Corps of Engineers
St. Paul District
Programs & Project Management

332 Minnesota St., Suite E1500
St. Paul, MN 55101

(651) 290-5755

cemvp-pm@usace.army.mil

Results:
Tag: 9-foot channel
Clear
  • April

    Dredged Material Management Plan: Pool 10, Wisconsin/Iowa

    The purpose of the Pool 10 Dredged Material Management Plan is to prepare a coordinated, long-term plan for managing dredged material in Pool 10. This plan was initiated due to needs for dredged material management at upland placement sites, especially in the downstream reach of the pool.
  • Dredged Material Management Plan: Pool 9, Minnesota/Wisconsin/Iowa

    The U.S. Army Corps of Engineers operates and maintains the Upper Mississippi River 9-Foot Channel Navigation Project, and one method used to maintain the 9-foot channel is dredging river soils or “material.” The purpose of the Pool 9 Dredged Material Management Plan is to prepare a coordinated long-term plan for managing dredged material in Pool 9. This plan was initiated due to needs for dredged material management at upland placement sites, especially in the upstream reach of the pool.
  • Upper Mississippi River 9-Foot Channel Navigation Project: Locks and Dams, Minnesota/Wisconsin/Iowa

    The U.S. Army Corps of Engineers St. Paul District is responsible for maintaining 244 miles of the Upper Mississippi River 9-foot channel navigation system. The navigation project within the St. Paul District includes 13 locks and dams that are operated and maintained by the U.S. Army Corps of Engineers.
  • Upper Mississippi River 9-Foot Channel Navigation Project: Maintenance, Minnesota/Wisconsin/Iowa

    The St. Paul District is responsible for maintaining 244 miles of the Upper Mississippi River 9-Foot Channel Navigation Project for inland navigation.