Contact

U.S. Army Corps of Engineers
St. Paul District
Programs & Project Management

332 Minnesota St., Suite E1500
St. Paul, MN 55101

(651) 290-5755

cemvp-pm@usace.army.mil

Results:
Tag: Bay City
Clear
  • April

    Upper Mississippi River – Navigation and Ecosystem Sustainability Program (NESP) Systemic Mitigation Island 4 Project

    Sedimentation and sediment resuspension caused a loss in water depth diversity of the backwater lakes and isolated wetlands above Lake Pepin as well as a loss in aquatic vegetation. Concerns over habitat deficiencies in Upper Pool 4 include reduced habitat diversity and quality, lack of aquatic vegetation and invertebrates, and reduced abundance of fish and wildlife. The project includes construction of a peninsula to improve habitat conditions by reducing wind, waves, and redirecting sediment inflows. It also includes overwintering dredging to support a deep water habitat for fish and bank and shoreline stabilization to reduce inflows and erosion during high flow events.