Contact

U.S. Army Corps of Engineers
St. Paul District
Programs & Project Management

332 Minnesota St., Suite E1500
St. Paul, MN 55101

(651) 290-5755

cemvp-pm@usace.army.mil

Results:
Tag: pool 9
Clear
  • April

    Dredged Material Management Plan: Pool 9, Minnesota/Wisconsin/Iowa

    The U.S. Army Corps of Engineers operates and maintains the Upper Mississippi River 9-Foot Channel Navigation Project, and one method used to maintain the 9-foot channel is dredging river soils or “material.” The purpose of the Pool 9 Dredged Material Management Plan is to prepare a coordinated long-term plan for managing dredged material in Pool 9. This plan was initiated due to needs for dredged material management at upland placement sites, especially in the upstream reach of the pool.
  • Upper Mississippi River Restoration Program: Reno Bottoms Habitat Restoration, Pool 9, Minnesota/Iowa

    The objective of this project is to protect, restore or create resilient and diverse bottomland forests. The quality and extent of the unique forest and aquatic habitat in the Reno Bottoms project area has been declining over the past several decades. Human-caused changes in hydrology, land use, and climate have increased water levels within the project area. Without action, the project area will continue to degrade.