Contact

U.S. Army Corps of Engineers
St. Paul District
Programs & Project Management

332 Minnesota St., Suite E1500
St. Paul, MN 55101

(651) 290-5755

cemvp-pm@usace.army.mil

Results:
Tag: Lock and Dam 7
Clear
  • April

    Navigation: Mississippi River Lock and Dam 7 Outdraft

    In 2017, a hydraulic study was launched to identify potential causes of the increased outdraft at Lock and Dam 7 and to investigate and implement measures to alleviate the condition. Flow measurements collected over the last 30 years indicate a significant shift in flows just upstream of Lock and Dam 7, with nearly 20% more flow coming through the existing navigation channel, which must then exit through the dam, exacerbating the outdraft condition.