This work will determine whether continued operation and ownership of Lower St. Anthony Falls Lock and Dam and Lock and Dam 1 are in the federal interest, and if not, consider alternatives for disposal of the property.
Published: 3/25/2026
The purpose of this work is to determine whether continued operation and ownership of the Upper St. Anthony Falls project is in the federal interest, and if not, consider alternatives for disposal of the property.
Published: 3/25/2026
Licensing of privately-owned hydropower projects on federal infrastructure and property within the St. Paul District.
Published: 3/23/2026
Maintenance of dam spillway gates are required to avoid degradation and eventual replacement. Cost analyses show it is economically favorable to maintain these gates rather than replace them. There are also reliability and safety concerns with allowing the gates to degrade to the point that they must be replaced.
Published: 3/24/2026
The Tribal Partnership Program provides authority for the U.S. Army Corps of Engineers to perform water-related planning activities and activities related to the study, design and construction of water resources development projects located primarily on tribal lands that substantially benefit federally recognized tribes.
Published: 3/24/2026
The St. Paul District is responsible for maintaining 244 miles of the Upper Mississippi River 9-foot channel navigation system. The navigation project within the St. Paul District includes 13 locks and dams that are operated and maintained by the U.S. Army Corps of Engineers.
Published: 3/25/2026
The St. Paul District is responsible for maintaining 244 miles of the Upper Mississippi River 9-Foot Channel Navigation Project for inland navigation.
Published: 3/25/2026