Minnesota Congressional District 3 projects and studies

Beneficial Use of Dredged Material: Section 1122, Upper Pool 4 – Lake Pepin, Bay City, Wisconsin

This project utilizes dredged material generated from the navigation channel to protect and restore backwater habitat; this is a win-win project for the U.S. Army Corps of Engineers, our partner agencies, and the environment. The Wisconsin Department of Natural Resources is the nonfederal sponsor.
Published: 4/15/2025

Disposition Study: Upper St. Anthony Falls and Lock and Dam, Upper Mississippi River

This work will determine whether continued operation and ownership of the Upper St. Anthony Falls Lock project is in the federal interest, and if not, consider alternatives for disposal of the property.
Published: 4/21/2025

Navigation: Routine Dam Gate Maintenance

Maintenance of dam spillway gates are required to avoid degradation and eventual replacement. Cost analyses show it is economically favorable to maintain these gates rather than replace them. There are also reliability and safety concerns with allowing the gates to degrade to the point that they must be replaced.
Published: 4/16/2025

Upper Mississippi River 9-Foot Channel Navigation Project: Maintenance, Minnesota/Wisconsin/Iowa

The St. Paul District is responsible for maintaining 244 miles of the Upper Mississippi River 9-Foot Channel Navigation Project for inland navigation.
Published: 4/21/2025