Public Notices - Minnesota and Wisconsin

Results:
Archive: June, 2026
Clear
  • 200th Street Wetland Bank

    Expiration date: 7/30/2026

    The proposal includes restoring a wetland and upland prairie complex within a 73.7-acre site. Approximately 35.6 acres within the site have been cultivated with corn and soybeans for over 20 years and approximately 31 acres within the site have been enrolled in the Conservation Reserve Program (CRP) since 2021. The CRP area would be bought prior to recording the conservation easement necessary for the wetland mitigation bank. Private drain tiles within the site appear to have fully drained historical wetlands. Specific objectives of the bank involve reestablishing 29.9 acres of wetland, including 5.4 acres of deep marsh, 12.3 acres of shallow marsh, and 12.2 areas of wet meadow communities, to generate approximately 36.8250 wetland mitigation credits. Hydrology is proposed to be restored within the site by breaking drain tiles, creating embankments, and installing new outlets at historical overflow elevations (see Figure 8 in the prospectus). Vegetation is proposed to be restored by treating and managing invasive species and seeding with native vegetation in both the wetland and upland areas.

  • Black Creek Mitigation Bank

    Expiration date: 7/23/2026

    The sponsor proposes to establish the Black Creek Mitigation Bank. The sponsor proposes to restore and preserve approximately 85.72 acres of wetlands and upland buffer in Outagamie County, Wisconsin. The objective is to restore and conserve hydrology and native vegetation communities for the purpose of generating compensatory mitigation credits for sale in the Fox River Bank Service Area.

  • Olsen LGRWP Wetland Bank

    Expiration date: 7/17/2026

    The Olsen Local Government Road Wetland Replacement Program (LGRWRP) Wetland Bank is a proposed mitigation bank project in Mower County, Minnesota,located approximately 7 miles north of Austin within Udolpho Township. The project area totals approximately 33.2 acres and is currently in annual row-crop agricultural production (corn and soybeans). The objective of the project is to restore a sloped wetland system of fresh wet meadow and native upland prairie within the Cedar River Watershed (Major Watershed No. 48, Bank Service Area 8).