Expiration date: 11/28/2020
PUBLIC NOTICE: The purpose of the proposed project is to increase the total containment capacity of Pool 2 by 9,000,000 gallons. As stated in the application, Enbridge can add approximately 3,000,000 gallons of capacity in Pool 2 by raising the height of the existing berm. Therefore, an additional dam is necessary downstream of Pool 2 with the capacity of approximately 6,000,000 gallons to achieve the desired total capacity of 9,000,000 gallons.