Public Notices - Minnesota and Wisconsin

Results:
Tag: Enbridge
Clear
  • Line 5 Notice of Availability

    Expiration date: 7/5/2024

    Public Notice: The existing Enbridge Line 5 pipeline is a 645 mile long, 30-inch diameter crude oil/natural gas liquid pipeline that has been operational since 1953. It originates at Enbridge’s Superior Terminal in Superior, Wisconsin, continues through northern Wisconsin and the Upper and Lower Peninsulas of Michigan, and terminates near Sarnia, Canada. In Wisconsin, the existing Line 5 pipeline crosses Douglas, Bayfield, Ashland and Iron counties. Within Ashland County, the existing Line 5 pipeline crosses through 12 miles of the Bad River Reservation. In 2019, the Bad River Band of the Lake Superior Tribe of Chippewa Indians filed a federal lawsuit to require Enbridge to remove the 12 miles of pipeline from their reservation.

  • Enbridge Line 5 Wisconsin Segment Relocation Project Hearing Public Notice

    The Corps will conduct a public hearing on June 4th, 2024. The public hearing will be held at the Northwood Technical College, located at 2100 Beaser Avenue, Ashland, WI 54806 from 11 a.m. - 3 p.m. and 4 p.m. - 8 p.m. CST.