*Scroll down for special public notices
-
Joint Public Notice - Beta Streamflow Duration Assessment Method for the Great Plains - The U.S. Army Corps of Engineers (Corps) Albuquerque, Chicago, Detroit, Fort Worth, Galveston, Kansas City, Omaha, Rock Island, St. Louis, St. Paul, and Tulsa Districts, and the U.S. Environmental Protection Agency (EPA), Regions 5, 6, 7, and 8, jointly announce the availability of the Beta Streamflow Duration Assessment Method (SDAM) for the Great Plains (dated September 2022). The method is a rapid assessment tool to help distinguish between ephemeral, intermittent, and perennial streamflow at the reach scale for the Northern and Southern Great Plains SDAM Regions. The beta SDAM may help provide technical guidance for identifying waters that may be subject to regulatory jurisdiction under Section 404 of the Clean Water Act; however, this method does not alter or change the definition of “Waters of the U.S.”
-
SPECIAL PUBLIC NOTICE: Release of Automated Wetland Determination Data Sheet (ADS) - On April 6, 2022, the U.S. Army Corps of Engineers (Corps), announced the release of ENG Forms 6116 (1-9), Automated Wetland Determination Data Sheet (ADS), and the associated “User Guide for Automated Wetland Determination Data Sheets” (User Guide). These documents are available at the USACE Regulatory Headquarters website in both Portable Document Format (PDF) and Microsoft Excel (Excel) file formats.
-
SPECIAL PUBLIC NOTICE: On March 1, 2022, the EPA provided a modification to their October 15, 2021, WQC decision that was applicable to the 34 NWPs (86 FR 73522, 27 DEC 2021) that went into effect on February 25, 2022, in St. Paul District. This modification clarifies the intent of the WQC’s Condition 2. Special Aquatic Sites and is applicable to NWPs 7, 13, and 27. The EPA’s October 15, 2021, Water Quality Certification decision and its March 1, 2022, modification are enclosed with this public notice.
-
SPECIAL PUBLIC NOTICE: Update on the Regional Conditions, Water Quality Certification (WQC) Decisions, and Coastal Zone Management Act (CZMA) Consistency Decisions for the 2021 NWPs in Minnesota and Wisconsin.
-
SPECIAL PUBLIC NOTICE: PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS - On December 27, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP. These 41 NWPs will go into effect on February 25, 2022, and they will expire on March 14, 2026.
-
SPECIAL PUBLIC NOTICE: The U.S. Army Corps of Engineers St. Paul District (Corps) is sharing information to describe the flexibility related to credit releases associated with meeting hydrology performance standards at mitigation bank and in-lieu fee (ILF) sites.
-
National Wetland Plant List (NWPL) Update: On November 2, 2021, the U.S. Army Corps of Engineers (Corps), as part of an interagency effort
with the U.S. Environmental Protection Agency (EPA), the U.S. Fish and Wildlife Service (FWS) and the U.S. Department of Agriculture Natural Resources Conservation Service (NRCS), published a final rule in the Federal Register announcing the availability of the 2020 NWPL.
-
SPECIAL PUBLIC NOTICE: Regional Conditions, Water Quality Certification (WQC), and Coastal Zone Management Act (CZMA) Concurrence for Sixteen (16) 2021 NWPs in St. Paul District.
-
Expiration date: 3/14/2026
SPECIAL PUBLIC NOTICE: On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. These 16 NWPs will go into effect on March 15, 2021, and will expire on March 14, 2026.
-
Expiration date: 12/23/2016
LETTER OF PERMISSION: The City of Appleton proposes to reconstruct CTH JJ from Ballard Road (CTH E) to a point located approximately 700 feet east of Lightening Drive.