Continuing Authorities Program (CAP)

Under the Continuing Authorities Program (CAP), the U.S. Army Corps of Engineers is authorized to plan, design and construct certain types of water resource and ecosystem restoration projects without additional and specific congressional authorization. The purpose is to implement projects of limited scope and complexity. Each authority has specific guidelines and total program and per-project funding limits. Studies are cost-shared 50/50 during feasibility. Most projects are cost-shared 65 percent Federal and 35 percent non-Federal during implementation, unless otherwise noted.
Published: 2/26/2015

Dam Bridge & Gate Painting – Lower St. Anthony Falls through Lock and Dam 10

The St. Paul District operates and maintains 13 locks and dams from Upper St. Anthony Falls in downtown Minneapolis, Minnesota, to Lock and Dam 10 in Guttenberg, Iowa. Each lock and dam is a critical step in the "stairway of water" that makes navigation possible between Minneapolis and St. Louis, Missouri. These facilities are aging structures, with locks and dams 2 through 10 originally constructed in the 1930s. These sites include a dam bridge and varying numbers of dam gates. The moveable dam gates are one of the most critical system components because they control pool elevation for navigation, flood control and environmental purposes.
Published: 2/26/2015

Dredged Material Management Plan (DMMP): Pool 9

The Pool 9 Dredged Material Management Plan (DMMP) study area is located between Lock and Dam 8 at Genoa, Wisconins, and Lock and Dam 9 near Lynxville, Wisconsin, spanning more than 31 river miles from 679.2 to 648.0. The purpose of the DMMP is to prepare, a coordinated long-term plan for managing dredged material in Pool 9 of the Upper Mississippi River for the purposes of continued operation and maintenance of the Upper Mississippi River 9-Foot Channel Navigation Project.
Published: 3/15/2018

Levee Safety Program (Iowa)

The basic objectives of the Levee Safety Program are to develop balanced and informed assessments of levees within the program; evaluate, prioritize and justify levee safety decisions; and recommend improvements to public safety associated with levee systems. The Corps created the National Levee Database, inventoried all levees in the program and improved inspection procedures. The Corps is developing a method to manage its levee systems and is reviewing and revising current levee-related policies and procedures.
Published: 2/26/2015

Mississippi River 9-Foot Project Channel Maintenance

The U.S. Army Corps of Engineers, St. Paul District is responsible for maintaining 244 miles of the Upper Mississippi River 9-foot channel navigation system from the head of navigation at Minneapolis, Minnesota, to Guttenberg, Iowa. The navigation system also includes the lower navigable portions of the Minnesota, St. Croix, and Black Rivers.
Published: 2/26/2015

Mississippi River 9-Foot Project, Locks and Dams

The St. Paul District is responsible for maintaining 244 miles of the Upper Mississippi River 9-foot channel navigation system from the head of navigation in Minneapolis, Minnesota, to Guttenberg, Iowa. The project is located in or contiguous to Minnesota, Wisconsin and Iowa. The navigation project within the St. Paul District includes 13 sets of locks and dams that are operated and maintained by the U.S. Army Corps of Engineers. In addition to the locks and dams the project includes channel maintenance, recreation and natural resource activities.
Published: 2/27/2015

Mississippi River Locks and Dams 2–10 Embankment Rehabilitation Adjacent to Structures

Earthfill embankments are integral to each of the Mississippi River Locks and Dams 2 through 10. The purpose of this project is to reestablish and armor degraded embankments to prevent further erosion and potential failure during high water events. The existing rock protection is well past its intended design life and does not perform satisfactorily. Wave action from high water causes continued widespread erosion.
Published: 2/26/2015

Mississippi River Locks and Dams 2–10 Guidewall Crib Repairs

Guidewalls are integral to each of the Mississippi River Locks and Dams 2 through 10. Guidewalls are long extensions of the lock walls, in either the upstream or downstream direction, that are parallel to the lock wall. These walls serve primarily to guide the long tows into the lock and to provide mooring facilities for tows too long to be accommodated in a single lockage. The guidewalls are constructed of multiple 35 to 40 feet length concrete monoliths with rock filled timber cribs beneath and behind them.
Published: 10/2/2015

Mississippi River Locks and Dams 2–10 Guidewall End Cell

Guidewalls are integral to each of the Mississippi River Locks and Dams 2 through 10. Guidewalls are long extensions of the lock walls, in either the upstream or downstream direction, that are parallel to the lock wall. These walls serve primarily to guide the long tows into the lock and to provide mooring facilities for tows too long to be accommodated in a single lockage.
Published: 3/16/2017

Mississippi River Locks and Dams 2–10 Non-Structural Embankment Repair

Non-structural embankment repair projects at Locks and Dams 2 through 10 will address restoring embankments to meet current design standards. Most dam embankments are currently protected from the erosive forces of water by a layer of riprap placed along the embankment’s length. When the riprap eventually erodes, the embankment itself will erode if more protection is not added. The U.S. Army Corps of Engineers has designed and placed berms and small islands to assist in reducing wave action and wind fetch within pools created by the locks and dams. Reducing these forces increases the longevity of the embankment protections.
Published: 3/22/2019

Mississippi River Locks and Dams 2–10 Tow Haulage System Repairs

The tow haulage system is integral to the operation of each of the Mississippi River Locks and Dams 2 through 10. It is attached to the top of the lock and dam guidewall and helps guide tows through the lock chamber. The Lock and Dam 2 through 10 tow haulage system has been deteriorating over the past number of years. Two failures at Lock 7 identified the need for a project to address serviceability and safety issues.
Published: 3/14/2016

Mississippi River Locks and Dams 3–10 Sheet Pile Installation at Auxiliary Locks

Lock and Dams 3-10 have a partially completed auxiliary chamber with a single set of miter gates that may be used to pass shallow draft navigation traffic in the event the lock chamber was out of operation and the upstream and downstream pools were equalized. The Auxiliary Miter Gates are considered emergency gates originally intended to allow for limited navigation if the main lock became inoperable. Only one set of miter gates were installed. Since installation, the auxiliary emergency gates have never been used and the gate operating machinery was never installed.
Published: 9/12/2016

Upper Mississippi River Restoration Program

The U.S. Army Corps of Engineers’ Upper Mississippi River Restoration Program includes studies and projects in the Upper Mississippi River system north of Cairo, Illinois. The system includes the Illinois River. This program, authorized by Congress in 1986, emphasizes habitat rehabilitation and enhancement projects and long-term resource monitoring. The habitat project component includes dredging backwater areas and channels, constructing dikes, creating and stabilizing islands and controlling side channel flows and water levels.
Published: 3/20/2017

Upper Mississippi River Restoration Program: Reno Bottoms

Much of the floodplain forest in the Reno Bottoms project area has been declining in coverage over the past several decades. Current Pool 9 water management and flow through the Lock and Dam 8 embankment have shifted the floodplain forest distribution to higher elevations than pre-impoundment conditions. Without active management, floodplain forest in the Reno Bottoms project area is likely to continue to degrade. The proposed project goals include protecting, maintaining and restoring floodplain hardwood forests to levels that are sustainable. The 14,000 acre Reno Bottoms area is located within the Upper Mississippi River National Wildlife and Fish Refuge in Houston County, Minnesota and Allamakee County, Iowa and is in Pool 9 between river miles 671‒682.