Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil 

 

Results:
Tag: Red River of the North
Clear
  • Corps of Engineers Red River of North reservoirs ready for spring

    The U.S. Army Corps of Engineers, St. Paul District, announced today, March 8, that its reservoirs along the Red River of the North are ready for any potential spring flooding.
  • Corps of Engineers is completing Drayton Dam removal

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is completing the demolition of Drayton Dam this week as part of an environmental mitigation project to remove ecological barriers, restore natural resources and reconnect the entire river.
  • Corps continues spring drawdowns in the Red River of the North basin

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, next week will begin the process of lowering Homme Dam, near Park River, North Dakota, to prepare for spring snowmelt.
  • Corps begins spring drawdowns in the Red River of the North basin

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is lowering its reservoirs within the Red River of the North basin based on recent snow measurements to prepare for potential spring snowmelt. Above average snowpack has increased the flood risk for this spring.
  • Corps of Engineers to begin annual drawdown of Ashtabula and Homme lakes

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, plans to drawdown or lower levels of two North Dakota reservoirs, Lake Ashtabula behind Baldhill Dam, near Valley City, and Homme Lake behind Homme Reservoir, near Park River, starting in November.
  • Corps of Engineers seeks comments on draft master plan for its four western Minnesota reservoirs

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is seeking public comments on its draft master plan and environmental assessment for Orwell Lake, near Fergus Falls, Minnesota; Lake Traverse, near Wheaton, Minnesota; Lac qui Parle Dam, near Watson, Minnesota; and Highway 75 Dam, near Odessa, Minnesota.
  • Corps continues to monitor its Red River of the North reservoirs

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is closely monitoring water levels at its Red River of the North reservoirs. Below average precipitation and drought conditions continue to impact reservoir levels and discharges. All locations are releasing the minimum flow or near the minimum flow.
  • Corps continues to monitor its Red River of the North reservoirs

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is closely monitoring water levels at its Red River of the North reservoirs. Below average precipitation and drought conditions continue to impact reservoir levels and discharges. Recent scattered precipitation in the basin has generally kept the pool elevations level.
  • Red Lake Dam flows reduced due to drought conditions

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is reducing flows from Red Lake Dam, at the outlet of Lower Red Lake, in Clearwater County, Minnesota, because of drought conditions across the state.
  • Corps monitoring its Red River of the North reservoirs

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is closely monitoring water levels at its Red River of the North reservoirs. Below average precipitation and drought conditions continue to impact reservoir levels and discharges.