Dredging Public Notices

Dredge Notice 23-13 Lower Approach to LD 6

U.S. Army Corps of Engineers, St. Paul District
Published June 28, 2023

DN 23-13                                            DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: June 28th, 2023                                           DREDGING CATEGORY: Emergency

MEETING DATE: If requested                                             MEETING TIME:

BOAT REQUIREMENT:                                                      MEETING LOCATION:

DREDGE CUT NAME: Lower Approach LD 6                   RIVER MILE: RM 713.8 – 714.0

 

HISTORIC DATA

Frequency: 32%                                              Avg. Quantity/Job: 24,041 yd3

Last Date Dredged: August 22nd, 2019          Avg. Quantity/Year: 7,711 yd3

 

SURVEY DATA

Date Surveyed: June 28th, 2023

Water Surface Elevation: 638.7

Low Control Pool Elevation: 638.5

Net Difference: +0.2’

5 Day River Forecast: Holding Steady

 

DREDGING DATA

Recommended Channel Width: 300 feet

Recommended Dredging Depth: 10 feet

Estimated Quantity: 5,340 yd3 plus placement access 100 yd3

Type of Dredge: Government Mechanical

Proposed Dredging Date: June 28th, 2023

Estimated Duration: 3- 12 hour dredging days

Justification for Dredging:  The approach area on the left descending side is closed between the 9’ contours, some vessels may be able to flank out of and into the lock but there is a significant challenge of maneuvering as well as a length restriction.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Dakota Island

Location: 7-706.5-RMT

Site Characteristics: This is a historically used temporary island site. 

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155.

 

 

 


ArticleCS - Dashboard

Dredge Notice 23-13 Lower Approach to LD 6

U.S. Army Corps of Engineers, St. Paul District
Published June 28, 2023

DN 23-13                                            DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: June 28th, 2023                                           DREDGING CATEGORY: Emergency

MEETING DATE: If requested                                             MEETING TIME:

BOAT REQUIREMENT:                                                      MEETING LOCATION:

DREDGE CUT NAME: Lower Approach LD 6                   RIVER MILE: RM 713.8 – 714.0

 

HISTORIC DATA

Frequency: 32%                                              Avg. Quantity/Job: 24,041 yd3

Last Date Dredged: August 22nd, 2019          Avg. Quantity/Year: 7,711 yd3

 

SURVEY DATA

Date Surveyed: June 28th, 2023

Water Surface Elevation: 638.7

Low Control Pool Elevation: 638.5

Net Difference: +0.2’

5 Day River Forecast: Holding Steady

 

DREDGING DATA

Recommended Channel Width: 300 feet

Recommended Dredging Depth: 10 feet

Estimated Quantity: 5,340 yd3 plus placement access 100 yd3

Type of Dredge: Government Mechanical

Proposed Dredging Date: June 28th, 2023

Estimated Duration: 3- 12 hour dredging days

Justification for Dredging:  The approach area on the left descending side is closed between the 9’ contours, some vessels may be able to flank out of and into the lock but there is a significant challenge of maneuvering as well as a length restriction.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Dakota Island

Location: 7-706.5-RMT

Site Characteristics: This is a historically used temporary island site. 

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155.

 

 

 


Dredge Notices - 2024

Dredge Notice 24-37 Indian Camp Light


NOTICE DATE: November 1st, 2024
Proposed Dredging Date: November 5th, 2024
DREDGE CUT NAME: Indian Camp Light
RIVER MILE: 665.4 - 666.0
POOL: 9
Published: 11/1/2024

Dredge Notice 24-36 Abv Mt Vernon Light


NOTICE DATE: October 31st, 2024
Proposed Dredging Date: November 4th, 2024
DREDGE CUT NAME: Abv Mt Vernon Light
RIVER MILE: 741.0 - 741.6
POOL: 5
Published: 10/31/2024

Dredge Notice 24-35 Cannon River

NOTICE DATE: 10/22/2024 Proposed Dredging Date: 10/24/2024 DREDGE CUT NAME: Cannon River RIVER MILE: 792.8 -793.7 POOL: 4
Published: 10/23/2024

Dredge Notice 24-34 Island 126


NOTICE DATE: October 8th, 2024
Proposed Dredging Date: October 11th, 2024
DREDGE CUT NAME: Island 126
RIVER MILE: 677.5 - 678.1
POOL: 9
Published: 10/8/2024

Dredge Notice 24-33 Blacksmith Slough


NOTICE DATE: October 8th, 2024
Proposed Dredging Date: October 9th, 2024
DREDGE CUT NAME: Blacksmith Slough
RIVER MILE: 719.0 - 719.3
POOL: 6
Published: 10/8/2024

Dredge Notice 24-32 St Paul Barge Terminal


NOTICE DATE: October 2nd, 2024
Proposed Dredging Date: October 3rd, 2024
DREDGE CUT NAME: St Paul Barge Terminal
RIVER MILE: 837.0 - 837.6
POOL: 2
Published: 10/2/2024

Dredge Notice 24-31 Lansing Upper Light


NOTICE DATE: September 23rd, 2024
Proposed Dredging Date: September 25th, 2024
DREDGE CUT NAME: Lansing Upper Light
RIVER MILE: 664.2 - 664.7
POOL: 9
Published: 9/23/2024

Dredge Notice 24-30 Deadmans Slough


NOTICE DATE: September 23rd, 2024
Proposed Dredging Date: September 25th, 2024
DREDGE CUT NAME: Deadmans Slough
RIVER MILE: 686.6 - 687.5
POOL: 8
Published: 9/23/2024

Dredge Notice 24-29 Lower Dresbach Island


NOTICE DATE: September 10th, 2024
Proposed Dredging Date: September 10th, 2024
DREDGE CUT NAME: Lower Dresbach Island
RIVER MILE: 703.1 - 703.3
POOL: 7
Published: 9/10/2024

Dredge Notice 24-28 Below Winona RR Bridge


NOTICE DATE: August 29th, 2024
Proposed Dredging Date: August 29th, 2024
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 722.8 - 723.8
POOL: 6
Published: 8/30/2024

Dredge Notice 24-27 Lower Appr to LD 6


NOTICE DATE: August 28th, 2024
Proposed Dredging Date: August 29th, 2024
DREDGE CUT NAME: Lower Appr to LD 6
RIVER MILE: 713.6 - 714.0
POOL: 7
Published: 8/28/2024

Dredge Notice 24-26 Petersons Bar


NOTICE DATE: August 26th, 2024
Proposed Dredging Date: August 26th, 2024
DREDGE CUT NAME: Petersons Bar
RIVER MILE: 11.7 - 12.5
POOL: MN River
Published: 8/26/2024

Dredge Notice 24-25 Sand Slough


NOTICE DATE: August 23rd, 2024
Proposed Dredging Date: August 26th, 2024
DREDGE CUT NAME: Sand Slough
RIVER MILE: 694.2 - 694.8
POOL: 8
Published: 8/24/2024

Dredge Notice 24-24 Head of Richmond Island


NOTICE DATE: August 21st, 2024
Proposed Dredging Date: August 21st, 2024
DREDGE CUT NAME: Head of Richmond Island
RIVER MILE: 712.6 - 713.2
POOL: 7
Published: 8/24/2024

Dredge Notice 24-23 Picayune Island


NOTICE DATE: August 16th, 2024
Proposed Dredging Date: August 17th, 2024
DREDGE CUT NAME: Picayune Island
RIVER MILE: 690.5 - 691.7
POOL: 8
Published: 8/16/2024

Dredge Notice 24-22 Lower Appr to LD 6


NOTICE DATE: August 16th, 2024
Proposed Dredging Date: August 16th, 2024
DREDGE CUT NAME: Lower Appr to LD 6
RIVER MILE: 713.5 - 714.0
POOL: 7
Published: 8/16/2024

Dredge Notice 24-21 Gravel Point


NOTICE DATE: August 12th, 2024
Proposed Dredging Date: August 12th, 2024
DREDGE CUT NAME: Gravel Point
RIVER MILE: 721.9 - 722.2
POOL: 6
Published: 8/12/2024

Dredge Notice 24-20 Beef Slough


NOTICE DATE: August 8th, 2024
Proposed Dredging Date: August 12th, 2024
DREDGE CUT NAME: Beef Slough
RIVER MILE: 754.1 - 754.4
POOL: 4
Published: 8/9/2024

Dredge Notice 24-19 Betsy Slough


NOTICE DATE: August 8th, 2024
Proposed Dredging Date: August 10th, 2024
DREDGE CUT NAME: Betsy Slough
RIVER MILE: 731.0 - 731.4
POOL: 5A
Published: 8/9/2024

Dredge Notice 24-18 Coulters Island


NOTICE DATE: August 1st, 2024
Proposed Dredging Date: August 2nd, 2024
DREDGE CUT NAME: Coulters Island
RIVER MILE: 801.5 - 802.0
POOL: 3
Published: 8/1/2024

Dredge Notice: 24-17 Teepeeota Point


NOTICE DATE: 7/29/2024
Proposed Dredging Date: 7/29/2024
DREDGE CUT NAME: Teepeeota Point
RIVER MILE: 757.1 - 758.0
POOL: 4
Published: 7/30/2024

Dredge Notice 24-16 Reads Landing


NOTICE DATE: July 24th, 2024
Proposed Dredging Date: July 25th, 2024
DREDGE CUT NAME: Reads Landing
RIVER MILE: 762.3 - 762.8
POOL: 4
Published: 7/24/2024

Dredge Notice 24-15 Head of Raft Channel


NOTICE DATE: July 22nd, 2024
Proposed Dredging Date: July 23rd, 2024
DREDGE CUT NAME: Head of Raft Channel
RIVER MILE: 687.5 - 688.2
POOL: 8
Published: 7/22/2024

Dredge Notice 24-14 Crats Island


NOTICE DATE: July 22nd, 2024
Proposed Dredging Date: July 23rd, 2024
DREDGE CUT NAME: Crats Island
RIVER MILE: 758.8 - 759.3
POOL: 4
Published: 7/22/2024

Dredge Notice 24-13 Homer


NOTICE DATE: July 18, 2024
Proposed Dredging Date: July 18, 2024
DREDGE CUT NAME: Homer
RIVER MILE: 720.0 - 720.9
POOL: 6
Published: 7/18/2024

Dredge Notice 24-12 Fisher Island


NOTICE DATE: July 10th, 2024
Proposed Dredging Date: July 11th, 2024
DREDGE CUT NAME: Fisher Island
RIVER MILE: 745.0 - 745.8
POOL: 5
Published: 7/10/2024

Dredge Notice 24-11 Freeborn Light


NOTICE DATE: July 10th, 2024
Proposed Dredging Date: July 10th, 2024
DREDGE CUT NAME: Freeborn Light
RIVER MILE: 818.2 - 819.1
POOL: 2
Published: 7/10/2024

Dredge Notice 24-10 Grand Encampment


NOTICE DATE: July 9th, 2024
Proposed Dredging Date: July 8th, 2024
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 755.9 - 756.8
POOL: 4
Published: 7/10/2024

Dredge Notice 24-09 Boulanger Bend


NOTICE DATE: July 8th, 2024
Proposed Dredging Date: July 8th, 2024
DREDGE CUT NAME: Boulanger Bend
RIVER MILE: 820.5
POOL: 2
Published: 7/8/2024

Dredge Notice 24-08 Mule Bend


NOTICE DATE: July 2nd, 2024
Proposed Dredging Date: July 2nd, 2024
DREDGE CUT NAME: Mule Ben
RIVER MILE: 747.9 - 749.1
POOL: 5
Published: 7/2/2024

Dredge Notice 24-07 Pine Bend

NOTICE DATE: June 13, 2024 Proposed Dredging Date: June 14, 2024 DREDGE CUT NAME: Pine Bend RIVER MILE: 822.7 – 823.8 POOL: 2
Published: 6/13/2024

Dredge Notice 24-06 Reads Landing

NOTICE DATE: June 12, 2024 Proposed Dredging Date: June 13, 2024 DREDGE CUT NAME: Reads Landing RIVER MILE: 762.5 -762.8 POOL: 4
Published: 6/13/2024

Dredge Notice 24-05 Boulanger Bend


NOTICE DATE: May 26th, 2024
Proposed Dredging Date: May 29th, 2024
DREDGE CUT NAME: Boulanger Bend
RIVER MILE: 820.4 - 821.4
POOL: 2
Published: 5/26/2024

Dredge Notice 24-04 Grand Encampment


NOTICE DATE: May 26th, 2024
Proposed Dredging Date: May 30th, 2024
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 756.0 - 756.8
POOL: 4
Published: 5/26/2024

Dredge Notice 24-03 Below Winona RR Bridge


NOTICE DATE: April 30th, 2024
Proposed Dredging Date: April 30th, 2024
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 722.9 - 723.6
POOL: 6
Published: 4/30/2024

Dredge Notice 24-02 LD 7 Chamber


NOTICE DATE: April 23rd, 2024
Proposed Dredging Date: April 24th, 2024
DREDGE CUT NAME: LD 7 Chamber
RIVER MILE: 702.5
POOL: 7
Published: 4/24/2024

Dredge Notice 24-01 Fountain City Service Base (FCSB) Harbor


NOTICE DATE: April 3, 2024
Proposed Dredging Date: April 4, 2024
DREDGE CUT NAME: FCSB Harbor
RIVER MILE: 733.4 - 733.7
POOL: 5A
Published: 4/3/2024

Dredge Notices - 2023

Dredge Notice 23-46 Pine Bend

NOTICE DATE: November 7th, 2023 DREDGING CATEGORY: Imminent DREDGE CUT NAME: Pine Bend RIVER MILE: 823.0-823.5
Published: 11/9/2023

Dredge Notice 23-45 Grand Encampment

NOTICE DATE: October 30th, 2023 DREDGING CATEGORY: Imminent DREDGE CUT NAME: Grand Encampment RIVER MILE: 755.6 – 756.8
Published: 10/30/2023

Dredge Notice 23-44 Boulanger Bend Lower Light


NOTICE DATE: October 23rd, 2023
Proposed Dredging Date: October 23rd, 2023
DREDGE CUT NAME: Boulanger Bend Lower Light
RIVER MILE: 819.5 - 820.3
POOL: 2
Published: 10/23/2023

Dredge Notice 23-43 Mouth of the MN River


NOTICE DATE: September 29th, 2023
Proposed Dredging Date: October 2nd, 2023
DREDGE CUT NAME: Mouth of the MN River
RIVER MILE: 0.6 - 1.0
POOL: MN River
Published: 9/29/2023

Dredge Notice 23-42 McMillan Island


NOTICE DATE: September 29th, 2023
Proposed Dredging Date: October 2nd, 2023
DREDGE CUT NAME: McMillan Island
RIVER MILE: 618.1 - 619.0
POOL: 10
Published: 9/29/2023

Dredge Notice 23-41 Trenton


NOTICE DATE: September 19th, 2023
Proposed Dredging Date: September 19th, 2023
DREDGE CUT NAME: Trenton
RIVER MILE: 794.3 - 794.6
POOL: 4
Published: 9/19/2023

Dredge Notice 23-40 Below Mt Vernon Light


NOTICE DATE: September 14th, 2023
Proposed Dredging Date: September 14th, 2023
DREDGE CUT NAME: Below Mt Vernon Light
RIVER MILE: 740.0 - 740.3
POOL: 5
Published: 9/14/2023

Dredge Notice 23-39 Sand Slough


NOTICE DATE: September 12th, 2023
Proposed Dredging Date: September 12th, 2023
DREDGE CUT NAME: Sand Slough
RIVER MILE: 694.3 - 694.6
POOL: 8
Published: 9/12/2023

Dredge Notice 23-38 Lansing Upper Light


NOTICE DATE: September 4th, 2023
Proposed Dredging Date: September 4th, 2023
DREDGE CUT NAME: Lansing Upper Light
RIVER MILE: 663.7 - 664.3
POOL: 9
Published: 9/4/2023

Dredge Notice 23-37 Head of Raft Channel


NOTICE DATE: August 25th, 2023
Proposed Dredging Date: August 26th, 2023
DREDGE CUT NAME: Head of Raft Channel
RIVER MILE: 687.5 - 688.2
POOL: 8
Published: 8/25/2023

Dredge Notice 23-36 Cannon River


NOTICE DATE: August 24th, 2023
Proposed Dredging Date: August 28th, 2023
DREDGE CUT NAME: Cannon River
RIVER MILE: 792.8 - 793.7
POOL: 4
Published: 8/24/2023

Dredge Notice 23-35 Brownsville


NOTICE DATE: August 21st, 2023
Proposed Dredging Date: August 21st, 2023
DREDGE CUT NAME: Brownsville
RIVER MILE: 688.6 - 689.1
POOL: 8
Published: 8/21/2023

Dredge Notice 23-34 Wilds Bend


NOTICE DATE: August 17th, 2023
Proposed Dredging Date: August 18th, 2023
DREDGE CUT NAME: Wilds Bend
RIVER MILE: 730.3 - 730.7
POOL: 5A
Published: 8/17/2023

Dredge Notice 23-33 Petersons Bar


NOTICE DATE: August 14th, 2023
Proposed Dredging Date: August 16th, 2023
DREDGE CUT NAME: Petersons Bar
RIVER MILE: 11.7 - 12.2
POOL: MN River
Published: 8/14/2023

Dredge Notice 23-32 Above Brownsville


NOTICE DATE: August 14th, 2023
Proposed Dredging Date: August 15th, 2023
DREDGE CUT NAME: Above Brownsville
RIVER MILE: 689.9 - 690.2
POOL: 8
Published: 8/14/2023

Dredge Notice 23-31 Lower Dresbach Island


NOTICE DATE: August 14th, 2023
Proposed Dredging Date: August 11th and 14th, 2023
DREDGE CUT NAME: Lower Dresbach Island
RIVER MILE: 703.0 - 703.4
POOL: 7
Published: 8/14/2023

Dredge Notice 23-30 Picayune Island


NOTICE DATE: August 8th, 2023
Proposed Dredging Date: August 8th, 2023
DREDGE CUT NAME: Picayune Island
RIVER MILE: 690.4 - 691.0
POOL: 8
Published: 8/8/2023

Dredge Notice 23-29 St Paul Barge Terminal


NOTICE DATE: August 3rd, 2023
Proposed Dredging Date: August 3rd, 2023
DREDGE CUT NAME: St Paul Barge Terminal
RIVER MILE: 837.4 - 837.7
POOL: 2
Published: 8/3/2023

Dredge Notice 23-28 Lower Zumbro


NOTICE DATE: July 28th, 2023
Proposed Dredging Date: July 30th, 2023
DREDGE CUT NAME: Lower Zumbro
RIVER MILE: 744.0 - 744.5
POOL: 5
Published: 7/28/2023

Dredge Notice 23-27 Peterson Bar


NOTICE DATE: July 28th, 2023
Proposed Dredging Date: July 28th, 2023
DREDGE CUT NAME: Petersons Bar
RIVER MILE: 11.8 - 12.6
POOL: MN River
Published: 7/28/2023

Dredge Notice 23-26 Winters Landing


NOTICE DATE: July 24th, 2023
Proposed Dredging Date: July 25th, 2023
DREDGE CUT NAME: Winters Landing
RIVER MILE: 707.6 - 708.1
POOL: 7
Published: 7/24/2023

Dredge Notice 23-25 Cargill Slip


NOTICE DATE: July 24th, 2023
Proposed Dredging Date: July 24th, 2023
DREDGE CUT NAME: Cargill Slip
RIVER MILE: 12.6 - 12.8
POOL: MN River
Published: 7/24/2023

Dredge Notice 23-24 Fisher Island


NOTICE DATE: July 23rd, 2023
Proposed Dredging Date: July 24th, 2023
DREDGE CUT NAME: Fisher Island
RIVER MILE: 744.9 - 745.8
POOL: 5
Published: 7/24/2023

DN 23-23 Mule Bend

Dredge Notice: DN 23-23 Notice Date: July 20, 2023 Proposed Dredging Date: July 20, 2023 DREDGE CUT NAME: Mule Bend RIVER MILE: 747.8 – 748.2 POOL: 5
Published: 7/21/2023

Dredge Notice 23-22 Betsy Slough


NOTICE DATE: July 17, 2023
Proposed Dredging Date: July 18, 2023
DREDGE CUT NAME: Betsy Slough
RIVER MILE: 731.1 – 732.0
POOL: 5A
Published: 7/17/2023

Dredge Notice 23-21 Mule Bend


NOTICE DATE: July 14th, 2023
Proposed Dredging Date: July 16th, 2023
DREDGE CUT NAME: Mule Bend
RIVER MILE: 748.3 - 749.0
POOL: 5
Published: 7/14/2023

Dredge Notice 23-20 Lansing Upper Light


NOTICE DATE: July 12th, 2023
Proposed Dredging Date: July 12th, 2023
DREDGE CUT NAME: Lansing Upper Light
RIVER MILE: 664.1 - 664.8
POOL: 9
Published: 7/12/2023

Dredge Notice 23-19 Boulanger Bend


NOTICE DATE: July 10th, 2023
Proposed Dredging Date: July 11th, 2023
DREDGE CUT NAME: Boulanger Bend
RIVER MILE: 821.0 - 821.4
POOL: 2
Published: 7/10/2023

Dredge Notice 23-18 Mississippi Gardens


NOTICE DATE: July 10th, 2023
Proposed Dredging Date: July 11th, 2023
DREDGE CUT NAME: Mississippi Gardens
RIVER MILE: 642.5 - 643.5
POOL: 10
Published: 7/10/2023

Dredge Notice 23-17 Lower Approach to LD 6


NOTICE DATE: July 10th, 2023
Proposed Dredging Date: July 11th, 2023
DREDGE CUT NAME: Lower Approach to LD 6
RIVER MILE: 713.6 - 714.2
POOL: 7
Published: 7/10/2023

Dredge Notice 23-16 Teepeeota Point


NOTICE DATE: July 10th, 2023
Proposed Dredging Date: July 10th, 2023
DREDGE CUT NAME: Teepeeota Point
RIVER MILE: 757.3 - 757.9
POOL: 4
Published: 7/10/2023

Dredge Notice 23-14 Crats Island


NOTICE DATE: July 3rd, 2023
Proposed Dredging Date: July 4th, 2023
DREDGE CUT NAME: Crats Island
RIVER MILE: 758.7 - 759.3
POOL: 4
Published: 7/3/2023

Dredge Notice 23-12 Beef Slough


NOTICE DATE: June 28th, 2023
Proposed Dredging Date: June 28th, 2023
DREDGE CUT NAME: Beef Slough
RIVER MILE: 754.0 - 754.4
POOL: 4
Published: 6/28/2023

Dredge Notice 23-11 Reads Landing


NOTICE DATE: June 27th, 2023
Proposed Dredging Date: June 27th, 2023
DREDGE CUT NAME: Reads Landing
RIVER MILE: 762.3 - 762.8
POOL: 4
Published: 6/27/2023

Dredge Notice 23-10 Fisher Island


NOTICE DATE: June 20th, 2023
Proposed Dredging Date: June 20th, 2023
DREDGE CUT NAME: Fisher Island
RIVER MILE: 745.0 - 745.3
POOL: 5
Published: 6/20/2023

Dredge Notice 23-09 St Paul Small Boat Harbor


NOTICE DATE: June 15th, 2023
Proposed Dredging Date: June 20th, 2023
DREDGE CUT NAME: St. Paul Small Boat Harbor
RIVER MILE: 839.6
POOL: 2
Published: 6/15/2023

Dredge Notice 23-08 Beef Slough


NOTICE DATE: June 15th, 2023
Proposed Dredging Date: June 16th, 2023
DREDGE CUT NAME: Beef Slough
RIVER MILE: 754.0 - 754.4
POOL: 4
Published: 6/15/2023

Dredge Notice 23-07 Indian Camp Light


NOTICE DATE: June 13th, 2023
Proposed Dredging Date: June 14th, 2023
DREDGE CUT NAME: Indian Camp Light
RIVER MILE: 665.2 - 665.9
POOL: 9
Published: 6/13/2023

Dredge Notice 23-06 Below Winona RR Bridge


NOTICE DATE: June 13th, 2023
Proposed Dredging Date: June 13th, 2023
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 722.9 - 723.7
POOL: 6
Published: 6/13/2023

Dredge Notice 23-04 Reads Landing


NOTICE DATE: June 5th, 2023
Proposed Dredging Date: June 5th, 2023
DREDGE CUT NAME: Reads Landing
RIVER MILE: 762.4 - 762.8
POOL: 4
Published: 6/5/2023

Dredge Notice 23-03 Homer


NOTICE DATE: May 18th, 2023
Proposed Dredging Date: May 18th, 2023
DREDGE CUT NAME: Homer
RIVER MILE: 720.1 - 720.8
POOL: 6
Published: 5/18/2023

Dredge Notice 23-02 Crats Island


NOTICE DATE: May 12th, 2023
Proposed Dredging Date: May 16th, 2023
DREDGE CUT NAME: Crats Island
RIVER MILE: 758.8 - 759.2
POOL: 4
Published: 5/12/2023

Dredge Notice 23-01 Freeborn Light


NOTICE DATE: May 12th, 2023
Proposed Dredging Date: May 15th, 2023
DREDGE CUT NAME: Freeborn Light
RIVER MILE: 818.5 - 819.0
POOL: 2
Published: 5/12/2023

Dredge Notices - 2022

Dredge Notices - 2021