Dredge Notice 22-21 Boulanger Bend

U.S. Army Corps of Engineers, St. Paul District
Published Aug. 17, 2022

DN 22-21                                            DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: August 17th, 2022                           DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                 MEETING TIME:

BOAT REQUIREMENT:                                          MEETING LOCATION:

DREDGE CUT NAME: Boulanger Bend                  RIVER MILE: 820.6 – 821.0

                                                                       

 

HISTORIC DATA

Frequency: 40%                                              Avg. Quantity/Job: 52,262 yd3

Date Last Dredged: June 1st, 2021                  Avg. Quantity/Year: 21,106 yd3

 

SURVEY DATA

Date Surveyed: August 11th, 2022

Water Surface Elevation: 686.7

Low Control Pool Elevation: 686.3

Net Difference: + 0.4’

5 Day River Forecast: Holding Steady

 

DREDGING DATA

Recommended Channel Width: 500

Recommended Dredging Depth: 12 feet

Estimated Quantity: 15,582 yd3

Type of Dredge: Contract Mechanical Plant 2

Proposed Dredging Date: August 17th, 2022

Estimated Duration: 8 dredging days

Justification for Dredging:  Channel is reduced to 320’ between the 9.0’ contours and 205’ between the 10.5’ contours. On a recommended bend width of 500’.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Lower Grey Cloud Island*

Location: 2-822.6-LMP

Site Characteristics: *This is a contractor selected placement location.  That has been previously reviewed in the DMMP.

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155

 


ArticleCS - Dashboard

Dredge Notice 22-21 Boulanger Bend

U.S. Army Corps of Engineers, St. Paul District
Published Aug. 17, 2022

DN 22-21                                            DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: August 17th, 2022                           DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                 MEETING TIME:

BOAT REQUIREMENT:                                          MEETING LOCATION:

DREDGE CUT NAME: Boulanger Bend                  RIVER MILE: 820.6 – 821.0

                                                                       

 

HISTORIC DATA

Frequency: 40%                                              Avg. Quantity/Job: 52,262 yd3

Date Last Dredged: June 1st, 2021                  Avg. Quantity/Year: 21,106 yd3

 

SURVEY DATA

Date Surveyed: August 11th, 2022

Water Surface Elevation: 686.7

Low Control Pool Elevation: 686.3

Net Difference: + 0.4’

5 Day River Forecast: Holding Steady

 

DREDGING DATA

Recommended Channel Width: 500

Recommended Dredging Depth: 12 feet

Estimated Quantity: 15,582 yd3

Type of Dredge: Contract Mechanical Plant 2

Proposed Dredging Date: August 17th, 2022

Estimated Duration: 8 dredging days

Justification for Dredging:  Channel is reduced to 320’ between the 9.0’ contours and 205’ between the 10.5’ contours. On a recommended bend width of 500’.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Lower Grey Cloud Island*

Location: 2-822.6-LMP

Site Characteristics: *This is a contractor selected placement location.  That has been previously reviewed in the DMMP.

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155

 


Dredge Notices - 2022

Dredge Notice 22-28 Upper Approach to LD 7


NOTICE DATE: September 26th, 2022
Proposed Dredging Date: September 28th, 2022
DREDGE CUT NAME: Upper Approach to LD 7
RIVER MILE: 702.5
POOL: 7
Published: 9/26/2022

Dredge Notice 22-27 Pine Bend Landing


NOTICE DATE: September 23rd, 2022
Proposed Dredging Date: September 26th, 2022
DREDGE CUT NAME: Pine Bend Landing
RIVER MILE: 824.1 - 824.5
POOL: 2
Published: 9/23/2022

Dredge Notice 22-26 McMillan Island


NOTICE DATE: September 13th, 2022
Proposed Dredging Date: September 13th, 2022
DREDGE CUT NAME: McMillan Island
RIVER MILE: 618.0-619.1
POOL: 10
Published: 9/13/2022

Dredge Notice 22-25 Lower Approach LD#2


NOTICE DATE: September 13th, 2022
Proposed Dredging Date: September 13th, 2022
DREDGE CUT NAME: Lower Approach LD#2
RIVER MILE: 814.5-815
POOL: 3
Published: 9/13/2022

Dredge Notice 22-24 Petersons Bar


NOTICE DATE: September 13th, 2022
Proposed Dredging Date: September 12th, 2022
DREDGE CUT NAME: Petersons Bar
RIVER MILE: 11.6-12.6
POOL: Minnesota River
Published: 9/13/2022

Dredge Notice 22-23 Boulanger Bend


NOTICE DATE: August 30th, 2022
Proposed Dredging Date: August 30th, 2022
DREDGE CUT NAME: Boulanger Bend
RIVER MILE: 820.3-820.6
POOL: 2
Published: 8/30/2022

Dredge Notice 22-22 Above Atchafalaya


NOTICE DATE: August 24th, 2022
Proposed Dredging Date: August 24th, 2022
DREDGE CUT NAME: Above Atchafalaya
RIVER MILE: 659.9-660.8
POOL: 9
Published: 8/25/2022

Dredge Notice 22-20 Indian Camp Light


NOTICE DATE: August 4th, 2022
Proposed Dredging Date: August 8th, 2022
DREDGE CUT NAME: Indian Camp Light
RIVER MILE: 665.2 - 665.9
POOL: 9
Published: 8/4/2022

Dredge Notice 22-19 Diamond Bluff


NOTICE DATE: July 28th, 2022
Proposed Dredging Date: July 28th, 2022
DREDGE CUT NAME: Diamond Bluff
RIVER MILE: 799.1 - 800.2
POOL: 3
Published: 7/28/2022

Dredge Notice 22-18 Lansing Upper Light


NOTICE DATE: July 22nd, 2022
Proposed Dredging Date: July 25th, 2022
DREDGE CUT NAME: Lansing Upper Light
RIVER MILE: 664.0 - 664.8
POOL: 9
Published: 7/22/2022

Dredge Notice 22-17 Beef Slough


NOTICE DATE: July 22nd, 2022
Proposed Dredging Date: July 22nd, 2022
DREDGE CUT NAME: Beef Slough
RIVER MILE: 754.1 - 754.4
POOL: 4
Published: 7/22/2022

Dredge Notice 22-16 Picayune Island


NOTICE DATE: July 15th, 2022
Proposed Dredging Date: July 15th, 2022
DREDGE CUT NAME: Picayune Island
RIVER MILE: 690.8 - 691.7
POOL: 8
Published: 7/15/2022

Dredge Notice 22-15 Diamond Bluff


NOTICE DATE: July 12th, 2022
Proposed Dredging Date: July 13th, 2022
DREDGE CUT NAME: Diamond Bluff
RIVER MILE: 800.1 - 800.7
POOL: 3
Published: 7/12/2022

Dredge Notice 22-14 Betsy Slough


NOTICE DATE: July 7th, 2022
Proposed Dredging Date: July 9th, 2022
DREDGE CUT NAME: Betsy Slough
RIVER MILE: 731.0 - 731.4
POOL: 5A
Published: 7/7/2022

Dredge Notice 22-13 Grand Encampment


NOTICE DATE: July 6th, 2022
Proposed Dredging Date: July 7th, 2022
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 755.8 - 756.1
POOL: 4
Published: 7/7/2022

Dredge Notice 22-12 Reads Landing


NOTICE DATE: July 1st, 2022
Proposed Dredging Date: July 2nd, 2022
DREDGE CUT NAME: Reads Landing
RIVER MILE: 762.4 - 762.8
POOL: 4
Published: 7/1/2022

Dredge Notice 22-11 Fisher Island


NOTICE DATE: June 22nd, 2022
Proposed Dredging Date: June 22nd, 2022
DREDGE CUT NAME: Fisher Island
RIVER MILE: 744.8 - 745.3
POOL: 5
Published: 6/22/2022

Dredge Notice 22-10 Coulters Island


NOTICE DATE: June 22nd, 2022
Proposed Dredging Date: June 22nd, 2022
DREDGE CUT NAME: Coulters Island
RIVER MILE: 801.6 - 802.0
POOL: 3
Published: 6/22/2022

Dredge Notice 22-09 Grand Encampment


NOTICE DATE: June 15th, 2022
Proposed Dredging Date: June 16th, 2022
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 756.2 - 756.8
POOL: 4
Published: 6/15/2022

Dredge Notice 22-08 Mule Bend


NOTICE DATE: June 15th, 2022
Proposed Dredging Date: June 15th, 2022
DREDGE CUT NAME: Mule Bend
RIVER MILE: 747.7 - 748.3
POOL: 5
Published: 6/15/2022

Dredge Notice 22-07 Below Winona RR Bridge


NOTICE DATE: June 15th, 2022
Proposed Dredging Date: June 15th, 2022
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 723.0 - 723.7
POOL: 6
Published: 6/15/2022

Dredge Notice 22-06 Mule Bend


NOTICE DATE: June 9th, 2022
Proposed Dredging Date: June 10th, 2022
DREDGE CUT NAME: Mule Bend
RIVER MILE: 748.3 - 749.0
POOL: 5
Published: 6/9/2022

Dredge Notice 22-05 Blacksmith Slough


NOTICE DATE: June 6th, 2022
Proposed Dredging Date: June 7th, 2022
DREDGE CUT NAME: Blacksmith Slough
RIVER MILE: 719.0 - 719.3
POOL: 6
Published: 6/6/2022

Dredge Notice 22-04 St Paul Small Boat Harbor


NOTICE DATE: May 27th, 2022
Proposed Dredging Date: June 1st, 2022
DREDGE CUT NAME: St Paul Small Boat Harbor
RIVER MILE: 839.6
POOL: 2
Published: 5/27/2022

Dredge Notice 22-03 Chippewa Delta


NOTICE DATE: May 27th, 2022
Proposed Dredging Date: June 1st, 2022
DREDGE CUT NAME: Chippewa Delta
RIVER MILE: 763.1 - 763.8
POOL: 4
Published: 5/27/2022

Dredge Notice 22-02 Homer


NOTICE DATE: May 17th, 2022
Proposed Dredging Date: May 19th, 2022
DREDGE CUT NAME: Homer
RIVER MILE: 719.7 - 720.7
POOL: 6
Published: 5/17/2022

Dredge Notice 22-01 Below Winona RR Bridge


NOTICE DATE: May 2nd, 2022
Proposed Dredging Date: May 4th, 2022
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 722.9 - 723.7
POOL: 6
Published: 5/2/2022

Dredge Notices - 2021

Dredge Notice 21-34 Dakota


NOTICE DATE: October 12th, 2021
Proposed Dredging Date: October 14th, 2021
DREDGE CUT NAME: Dakota
RIVER MILE: 706.0 - 706.4
POOL: 7
Published: 10/12/2021

Dredge Notice 21-33 LD 6 Aux Lock


NOTICE DATE: October 12th, 2021
Proposed Dredging Date: October 13th, 2021
DREDGE CUT NAME: LD 6 Aux Lock
RIVER MILE: 714.1 - 714.3
POOL: 7
Published: 10/12/2021

Dredge Notice 21-32 Blacksmith Slough


NOTICE DATE: October 4th, 2021
Proposed Dredging Date: October 4th, 2021
DREDGE CUT NAME: Blacksmith Slough
RIVER MILE: 719.0 - 719.4
POOL: 6
Published: 10/4/2021

Dredge Notice 21-31 Grand Encampment


NOTICE DATE: September 27th, 2021
Proposed Dredging Date: September 29th, 2021
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 756.3 - 756.8
POOL: 4
Published: 9/27/2021

Dredge Notice 21-29 Diamond Bluff


NOTICE DATE: September 22nd, 2021
Dredging Date: September 21st, 2021
DREDGE CUT NAME: Diamond Bluff
RIVER MILE: 800.1 - 800.6
POOL: 3
Published: 9/22/2021

Dredge Notice 21-28 Diamond Bluff


NOTICE DATE: September 9th, 2021
Proposed Dredging Date: September 13th, 2021
DREDGE CUT NAME: Diamond Bluff
RIVER MILE: 798.9 - 799.4
POOL: 3
Published: 9/9/2021

Dredge Notice 21-27 Below Winona RR Bridge


NOTICE DATE: September 9th, 2021
Proposed Dredging Date: September 10th, 2021
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 722.7 - 723.2
POOL: 6
Published: 9/9/2021

Dredge Notice 21-25 Below Winona RR Bridge


NOTICE DATE: August 30th, 2021
Proposed Dredging Date: August 31st, 2021
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 723.3 - 723.7
POOL: 6
Published: 8/30/2021

Dredge Notice 21-24 Cannon River


NOTICE DATE: August 20th, 2021
Proposed Dredging Date: August 23rd, 2021
DREDGE CUT NAME: Cannon River
RIVER MILE: 792.8 - 793.5
POOL: 4
Published: 8/20/2021

Dredge Notice 21-23 Above Savage RR Bridge


NOTICE DATE: August 13th, 2021
Proposed Dredging Date: August 13th, 2021
DREDGE CUT NAME: Above Savage RR Bridge
RIVER MILE: 14.4 - 14.7
POOL: MN River
Published: 8/13/2021

Dredge Notice 21-22 Petersons Bar


NOTICE DATE: July 29th, 2021
Proposed Dredging Date: August 3rd, 2021
DREDGE CUT NAME: Petersons Bar
RIVER MILE: 12.2 - 12.6
POOL: MN River
Published: 7/29/2021

Dredge Notice 21-19 Diamond Bluff

br>NOTICE DATE: July 12th, 2021
Proposed Dredging Date: July 12th, 2021
DREDGE CUT NAME: Diamond Bluff
RIVER MILE: 799.6 - 800.7
POOL: 3
Published: 7/14/2021

Dredge Notice 21-18 Lower Zumbro


NOTICE DATE: June 26th, 2021
Proposed Dredging Date: June 28th, 2021
DREDGE CUT NAME: Lower Zumbro
RIVER MILE: 743.1 - 744.5
POOL: 5
Published: 6/26/2021

Dredge Notice 21-17 Indian Camp Light


NOTICE DATE: June 24th, 2021
Proposed Dredging Date: June 24th, 2021
DREDGE CUT NAME: Indian Camp Light
RIVER MILE: 665.0 - 665.8
POOL: 9
Published: 6/24/2021

Dredge Notice 21-16 Morgans Coulee


NOTICE DATE: June 24th, 2021
Proposed Dredging Date: June 24th, 2021
DREDGE CUT NAME: Morgans Coulee
RIVER MILE: 802.0 - 803.0
POOL: 3
Published: 6/24/2021

Dredge Notice 21-15 Winters Landing


NOTICE DATE: June 18th, 2021
Proposed Dredging Date: June 21st, 2021
DREDGE CUT NAME: Winters Landing
RIVER MILE: 707.5 - 708.0
POOL: 7
Published: 6/18/2021

Dredge Notice 21-14 Fisher Island


NOTICE DATE: June 18th, 2021
Proposed Dredging Date: June 20th, 2021
DREDGE CUT NAME: Fisher Island
RIVER MILE: 744.6 - 745.3
POOL: 5
Published: 6/18/2021

Dredge Notice 21-13 Betsy Slough


NOTICE DATE: June 9th, 2021
Proposed Dredging Date: June 9th, 2021
DREDGE CUT NAME: Betsy Slough
RIVER MILE: 730.9 - 731.9
POOL: 5A
Published: 6/9/2021

Dredge Notice 21-12 Grand Encampment


NOTICE DATE: June 5th, 2021
Proposed Dredging Date: June 5th, 2021
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 755.7 - 756.8
POOL: 4
Published: 6/5/2021

Dredge Notice 21-11 Coulters Island


NOTICE DATE: June 1st, 2021
Proposed Dredging Date: June 2nd, 2021
DREDGE CUT NAME: Coulters Island
RIVER MILE: 801.5 - 802.0
POOL: 3
Published: 6/1/2021

Dredge Notice 21-10 Head of Raft Channel


NOTICE DATE: June 1st, 2021
Proposed Dredging Date: June 2nd, 2021
DREDGE CUT NAME: Head of Raft Channel
RIVER MILE: 687.5 - 688.2
POOL: 8
Published: 6/1/2021

Dredge Notice 21-09 Grand Encampment


NOTICE DATE: June 1st, 2021
Proposed Dredging Date: June 1st, 2021
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 755.7 - 756.8
POOL: 4
Published: 6/1/2021

Dredge Notice 21-08 East Channel


NOTICE DATE: May 20th, 2021
Proposed Dredging Date: May 20th, 2021
DREDGE CUT NAME: East Channel
RIVER MILE: 635.5 - 636.5
POOL: 10
Published: 5/20/2021

Dredge Notice 21-06 Deadmans Slough


NOTICE DATE: May 14th, 2021
Proposed Dredging Date: May 18th, 2021
DREDGE CUT NAME: Deadmans Slough
RIVER MILE: 686.5 - 687.5
POOL: 8
Published: 5/14/2021

Dredge Notice 21-04 Crats Island


NOTICE DATE: May 4th, 2021
Proposed Dredging Date: May 4th, 2021
DREDGE CUT NAME: Crats Island
RIVER MILE: 758.4 - 759.3
POOL: 4
Published: 5/4/2021

Dredge Notice 21-03 Beef Slough


NOTICE DATE: April 19th, 2021
Proposed Dredging Date: April 21st, 2021
DREDGE CUT NAME: Beef Slough
RIVER MILE: 753.9 - 754.4
POOL: 4
Published: 4/19/2021

Dredge Notice 21-02 Pine Bend


NOTICE DATE: April 19th, 2021
Proposed Dredging Date: April 19th, 2021
DREDGE CUT NAME: Pine Bend
RIVER MILE: 822.6 - 823.7
POOL: 2
Published: 4/19/2021

Dredge Notice 21-01 McMillan Island


NOTICE DATE: April 11, 2021
Proposed Dredging Date: April 12, 2021
DREDGE CUT NAME: McMillan Island
RIVER MILE: 617.7 - 618.3
POOL: 10
Published: 4/11/2021