Dredge Notice 22-15 Diamond Bluff

U.S. Army Corps of Engineers, St. Paul District
Published July 12, 2022

DN 22-15                                            DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: July 12th, 2022                                DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                 MEETING TIME:

BOAT REQUIREMENT:                                          MEETING LOCATION:

DREDGE CUT NAME: Diamond Bluff                   RIVER MILE: 800.1 – 800.7

                                                                       

 

HISTORIC DATA

Frequency: 50%                                              Avg. Quantity/Job: 34,100 yd3

Date Last Dredged: Oct. 6th, 2021                  Avg. Quantity/Year: 17,050 yd3

 

SURVEY DATA

Date Surveyed: July 7th, 2022

Water Surface Elevation: 674.3

Low Control Pool Elevation: 673.8

Net Difference: + 0.5’

5 Day River Forecast: Slow Decline

 

DREDGING DATA

Recommended Channel Width: 450 feet

Recommended Dredging Depth: 12 feet

Estimated Quantity:  25,889 yd3

Type of Dredge: Contract Mechanical Plant 2

Proposed Dredging Date: July 13th, 2022

Estimated Duration: 13 dredging days

Justification for Dredging:  The navigation channel is reduced to 330’ between the 9’ contours and closed between the 10.5’ contours on a recommended bend of 450’.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Corps Island

Location: 3-799.2-RMT

Site Characteristics: This is a historically used transfer site.

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155

 

 


ArticleCS - Dashboard

Dredge Notice 22-15 Diamond Bluff

U.S. Army Corps of Engineers, St. Paul District
Published July 12, 2022

DN 22-15                                            DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: July 12th, 2022                                DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                 MEETING TIME:

BOAT REQUIREMENT:                                          MEETING LOCATION:

DREDGE CUT NAME: Diamond Bluff                   RIVER MILE: 800.1 – 800.7

                                                                       

 

HISTORIC DATA

Frequency: 50%                                              Avg. Quantity/Job: 34,100 yd3

Date Last Dredged: Oct. 6th, 2021                  Avg. Quantity/Year: 17,050 yd3

 

SURVEY DATA

Date Surveyed: July 7th, 2022

Water Surface Elevation: 674.3

Low Control Pool Elevation: 673.8

Net Difference: + 0.5’

5 Day River Forecast: Slow Decline

 

DREDGING DATA

Recommended Channel Width: 450 feet

Recommended Dredging Depth: 12 feet

Estimated Quantity:  25,889 yd3

Type of Dredge: Contract Mechanical Plant 2

Proposed Dredging Date: July 13th, 2022

Estimated Duration: 13 dredging days

Justification for Dredging:  The navigation channel is reduced to 330’ between the 9’ contours and closed between the 10.5’ contours on a recommended bend of 450’.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Corps Island

Location: 3-799.2-RMT

Site Characteristics: This is a historically used transfer site.

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155

 

 


Dredge Notices - 2023

Dredge Notice 23-03 Homer


NOTICE DATE: May 18th, 2023
Proposed Dredging Date: May 18th, 2023
DREDGE CUT NAME: Homer
RIVER MILE: 720.1 - 720.8
POOL: 6
Published: 5/18/2023

Dredge Notice 23-02 Crats Island


NOTICE DATE: May 12th, 2023
Proposed Dredging Date: May 16th, 2023
DREDGE CUT NAME: Crats Island
RIVER MILE: 758.8 - 759.2
POOL: 4
Published: 5/12/2023

Dredge Notice 23-01 Freeborn Light


NOTICE DATE: May 12th, 2023
Proposed Dredging Date: May 15th, 2023
DREDGE CUT NAME: Freeborn Light
RIVER MILE: 818.5 - 819.0
POOL: 2
Published: 5/12/2023

Dredge Notices - 2022

Dredge Notice 22-33 Above Brownsville


NOTICE DATE: November 7th, 2022
Proposed Dredging Date: November 7th, 2022
DREDGE CUT NAME: Above Brownsville
RIVER MILE: 690.4 - 690.8
POOL: 8
Published: 11/7/2022

Dredge Notice 22-32 Winters Landing


NOTICE DATE: November 4th, 2022
Proposed Dredging Date: November 7th, 2022
DREDGE CUT NAME: Winters Landing
RIVER MILE: 707.5 - 708.3
POOL: 7
Published: 11/4/2022

Dredge Notice 22-31 Picayune Island


NOTICE DATE: October 24th, 2022
Proposed Dredging Date: October 24th, 2022
DREDGE CUT NAME: Picayune Island
RIVER MILE: 690.8 - 691.1
POOL: 8
Published: 10/24/2022

Dredge Notice 22-30 Island 126


NOTICE DATE: October 7th, 2022
Proposed Dredging Date: October 10th, 2022
DREDGE CUT NAME: Island 126
RIVER MILE: 677.5 - 678.1
POOL: 9
Published: 10/7/2022

Dredge Notice 22-29 Root River


NOTICE DATE: October 7th, 2022
Proposed Dredging Date: October 12th, 2022
DREDGE CUT NAME: Root River
RIVER MILE: 693.6 - 693.8
POOL: 8
Published: 10/7/2022

Dredge Notice 22-28 Upper Approach to LD 7


NOTICE DATE: September 26th, 2022
Proposed Dredging Date: September 28th, 2022
DREDGE CUT NAME: Upper Approach to LD 7
RIVER MILE: 702.5
POOL: 7
Published: 9/26/2022

Dredge Notice 22-27 Pine Bend Landing


NOTICE DATE: September 23rd, 2022
Proposed Dredging Date: September 26th, 2022
DREDGE CUT NAME: Pine Bend Landing
RIVER MILE: 824.1 - 824.5
POOL: 2
Published: 9/23/2022

Dredge Notice 22-26 McMillan Island


NOTICE DATE: September 13th, 2022
Proposed Dredging Date: September 13th, 2022
DREDGE CUT NAME: McMillan Island
RIVER MILE: 618.0-619.1
POOL: 10
Published: 9/13/2022

Dredge Notice 22-25 Lower Approach LD#2


NOTICE DATE: September 13th, 2022
Proposed Dredging Date: September 13th, 2022
DREDGE CUT NAME: Lower Approach LD#2
RIVER MILE: 814.5-815
POOL: 3
Published: 9/13/2022

Dredge Notice 22-24 Petersons Bar


NOTICE DATE: September 13th, 2022
Proposed Dredging Date: September 12th, 2022
DREDGE CUT NAME: Petersons Bar
RIVER MILE: 11.6-12.6
POOL: Minnesota River
Published: 9/13/2022

Dredge Notice 22-23 Boulanger Bend


NOTICE DATE: August 30th, 2022
Proposed Dredging Date: August 30th, 2022
DREDGE CUT NAME: Boulanger Bend
RIVER MILE: 820.3-820.6
POOL: 2
Published: 8/30/2022

Dredge Notice 22-22 Above Atchafalaya


NOTICE DATE: August 24th, 2022
Proposed Dredging Date: August 24th, 2022
DREDGE CUT NAME: Above Atchafalaya
RIVER MILE: 659.9-660.8
POOL: 9
Published: 8/25/2022

Dredge Notice 22-21 Boulanger Bend


NOTICE DATE: August 17th, 2022
Proposed Dredging Date: August 18th, 2022
DREDGE CUT NAME: Boulanger Bend
RIVER MILE: 820.6 - 821.0
POOL: 2
Published: 8/17/2022

Dredge Notice 22-20 Indian Camp Light


NOTICE DATE: August 4th, 2022
Proposed Dredging Date: August 8th, 2022
DREDGE CUT NAME: Indian Camp Light
RIVER MILE: 665.2 - 665.9
POOL: 9
Published: 8/4/2022

Dredge Notice 22-19 Diamond Bluff


NOTICE DATE: July 28th, 2022
Proposed Dredging Date: July 28th, 2022
DREDGE CUT NAME: Diamond Bluff
RIVER MILE: 799.1 - 800.2
POOL: 3
Published: 7/28/2022

Dredge Notice 22-18 Lansing Upper Light


NOTICE DATE: July 22nd, 2022
Proposed Dredging Date: July 25th, 2022
DREDGE CUT NAME: Lansing Upper Light
RIVER MILE: 664.0 - 664.8
POOL: 9
Published: 7/22/2022

Dredge Notice 22-17 Beef Slough


NOTICE DATE: July 22nd, 2022
Proposed Dredging Date: July 22nd, 2022
DREDGE CUT NAME: Beef Slough
RIVER MILE: 754.1 - 754.4
POOL: 4
Published: 7/22/2022

Dredge Notice 22-16 Picayune Island


NOTICE DATE: July 15th, 2022
Proposed Dredging Date: July 15th, 2022
DREDGE CUT NAME: Picayune Island
RIVER MILE: 690.8 - 691.7
POOL: 8
Published: 7/15/2022

Dredge Notice 22-14 Betsy Slough


NOTICE DATE: July 7th, 2022
Proposed Dredging Date: July 9th, 2022
DREDGE CUT NAME: Betsy Slough
RIVER MILE: 731.0 - 731.4
POOL: 5A
Published: 7/7/2022

Dredge Notice 22-13 Grand Encampment


NOTICE DATE: July 6th, 2022
Proposed Dredging Date: July 7th, 2022
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 755.8 - 756.1
POOL: 4
Published: 7/7/2022

Dredge Notice 22-12 Reads Landing


NOTICE DATE: July 1st, 2022
Proposed Dredging Date: July 2nd, 2022
DREDGE CUT NAME: Reads Landing
RIVER MILE: 762.4 - 762.8
POOL: 4
Published: 7/1/2022

Dredge Notice 22-11 Fisher Island


NOTICE DATE: June 22nd, 2022
Proposed Dredging Date: June 22nd, 2022
DREDGE CUT NAME: Fisher Island
RIVER MILE: 744.8 - 745.3
POOL: 5
Published: 6/22/2022

Dredge Notice 22-10 Coulters Island


NOTICE DATE: June 22nd, 2022
Proposed Dredging Date: June 22nd, 2022
DREDGE CUT NAME: Coulters Island
RIVER MILE: 801.6 - 802.0
POOL: 3
Published: 6/22/2022

Dredge Notice 22-09 Grand Encampment


NOTICE DATE: June 15th, 2022
Proposed Dredging Date: June 16th, 2022
DREDGE CUT NAME: Grand Encampment
RIVER MILE: 756.2 - 756.8
POOL: 4
Published: 6/15/2022

Dredge Notice 22-08 Mule Bend


NOTICE DATE: June 15th, 2022
Proposed Dredging Date: June 15th, 2022
DREDGE CUT NAME: Mule Bend
RIVER MILE: 747.7 - 748.3
POOL: 5
Published: 6/15/2022

Dredge Notice 22-07 Below Winona RR Bridge


NOTICE DATE: June 15th, 2022
Proposed Dredging Date: June 15th, 2022
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 723.0 - 723.7
POOL: 6
Published: 6/15/2022

Dredge Notice 22-06 Mule Bend


NOTICE DATE: June 9th, 2022
Proposed Dredging Date: June 10th, 2022
DREDGE CUT NAME: Mule Bend
RIVER MILE: 748.3 - 749.0
POOL: 5
Published: 6/9/2022

Dredge Notice 22-05 Blacksmith Slough


NOTICE DATE: June 6th, 2022
Proposed Dredging Date: June 7th, 2022
DREDGE CUT NAME: Blacksmith Slough
RIVER MILE: 719.0 - 719.3
POOL: 6
Published: 6/6/2022

Dredge Notice 22-04 St Paul Small Boat Harbor


NOTICE DATE: May 27th, 2022
Proposed Dredging Date: June 1st, 2022
DREDGE CUT NAME: St Paul Small Boat Harbor
RIVER MILE: 839.6
POOL: 2
Published: 5/27/2022

Dredge Notice 22-03 Chippewa Delta


NOTICE DATE: May 27th, 2022
Proposed Dredging Date: June 1st, 2022
DREDGE CUT NAME: Chippewa Delta
RIVER MILE: 763.1 - 763.8
POOL: 4
Published: 5/27/2022

Dredge Notice 22-02 Homer


NOTICE DATE: May 17th, 2022
Proposed Dredging Date: May 19th, 2022
DREDGE CUT NAME: Homer
RIVER MILE: 719.7 - 720.7
POOL: 6
Published: 5/17/2022

Dredge Notice 22-01 Below Winona RR Bridge


NOTICE DATE: May 2nd, 2022
Proposed Dredging Date: May 4th, 2022
DREDGE CUT NAME: Below Winona RR Bridge
RIVER MILE: 722.9 - 723.7
POOL: 6
Published: 5/2/2022

Dredge Notices - 2021