DN 19-10                                            DREDGING NOTICE

                                               U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: May 30th, 2019                                DREDGING CATEGORY: Emergency

MEETING DATE: If requested                                  MEETING TIME:

BOAT REQUIREMENT:                                           MEETING LOCATION:

DREDGE CUT NAME: Homer                                 RIVER MILE: 720.0 – 720.8

                                                                       

HISTORIC DATA

Frequency:  26%                                            Avg. Quantity/Job:  31,023 yd3

Date Last Dredged: July 19th, 2017               Avg. Quantity/Year:  7,914 yd3

 

SURVEY DATA

Date Surveyed: May 21st, 2019

Water Surface Elevation: 648.5

Low Control Pool Elevation: 644.2

Net Difference: + 4.3’

5-Day River Forecast: Slow decline after day 3

 

DREDGING DATA

Recommended Channel Width: 300 feet

Recommended Dredging Depth: 11 feet

Estimated Quantity: 12,351 yd3

Type of Dredge: Government Mechanical

Proposed Dredging Date: May 30th, 2019

Estimated Duration: 16 dredging days

Justification for Dredging: The navigation channel is closed between the 9.0’ contours and the 10.5’ contours.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Homer

Location: 6-720.5 RMP

Site Characteristics: The Homer placement site is a historically used stockpile site. 

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155.

 

 


Dredge Notice 19-10 Homer

Published May 30, 2019

DN 19-10                                            DREDGING NOTICE

                                               U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: May 30th, 2019                                DREDGING CATEGORY: Emergency

MEETING DATE: If requested                                  MEETING TIME:

BOAT REQUIREMENT:                                           MEETING LOCATION:

DREDGE CUT NAME: Homer                                 RIVER MILE: 720.0 – 720.8

                                                                       

HISTORIC DATA

Frequency:  26%                                            Avg. Quantity/Job:  31,023 yd3

Date Last Dredged: July 19th, 2017               Avg. Quantity/Year:  7,914 yd3

 

SURVEY DATA

Date Surveyed: May 21st, 2019

Water Surface Elevation: 648.5

Low Control Pool Elevation: 644.2

Net Difference: + 4.3’

5-Day River Forecast: Slow decline after day 3

 

DREDGING DATA

Recommended Channel Width: 300 feet

Recommended Dredging Depth: 11 feet

Estimated Quantity: 12,351 yd3

Type of Dredge: Government Mechanical

Proposed Dredging Date: May 30th, 2019

Estimated Duration: 16 dredging days

Justification for Dredging: The navigation channel is closed between the 9.0’ contours and the 10.5’ contours.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Homer

Location: 6-720.5 RMP

Site Characteristics: The Homer placement site is a historically used stockpile site. 

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155.