DN 17-13                                            DREDGING NOTICE

                                               U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: June 9th, 2017                                  DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                  MEETING TIME:

BOAT REQUIREMENT:                                           MEETING LOCATION:

DREDGE CUT NAME: Homer                                 RIVER MILE: 720.0 – 720.8

                                                                       

HISTORIC DATA

Frequency:  26%                                            Avg. Quantity/Job:  27,737 yd3

Date Last Dredged: August 4th, 2016             Avg. Quantity/Year:  7,337 yd3

 

SURVEY DATA

Date Surveyed: June 6th, 2017

Water Surface Elevation: 646.5

Low Control Pool Elevation: 644.2

Net Difference: + 2.3’

5-Day River Forecast: Slow decline

 

DREDGING DATA

Recommended Channel Width: 300 feet

Recommended Dredging Depth: 12 feet

Estimated Quantity: 31,499 yd3

Type of Dredge: Government Mechanical

Proposed Dredging Date: June 12th, 2017

Estimated Duration: 16 dredging days

Justification for Dredging: The navigation channel is reduced to 160 feet between the 9.0’ contours and closed between the 10.5’ contours.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Homer

Location: 6-720.5 RMP

Site Characteristics: The Homer placement site is a historically used stockpile site. 

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a Channel Maintenance Coordinator at (651) 290-5155.

 

 

 


Dredge Notice 17-13 Homer

Published June 9, 2017

DN 17-13                                            DREDGING NOTICE

                                               U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: June 9th, 2017                                  DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                  MEETING TIME:

BOAT REQUIREMENT:                                           MEETING LOCATION:

DREDGE CUT NAME: Homer                                 RIVER MILE: 720.0 – 720.8

                                                                       

HISTORIC DATA

Frequency:  26%                                            Avg. Quantity/Job:  27,737 yd3

Date Last Dredged: August 4th, 2016             Avg. Quantity/Year:  7,337 yd3

 

SURVEY DATA

Date Surveyed: June 6th, 2017

Water Surface Elevation: 646.5

Low Control Pool Elevation: 644.2

Net Difference: + 2.3’

5-Day River Forecast: Slow decline

 

DREDGING DATA

Recommended Channel Width: 300 feet

Recommended Dredging Depth: 12 feet

Estimated Quantity: 31,499 yd3

Type of Dredge: Government Mechanical

Proposed Dredging Date: June 12th, 2017

Estimated Duration: 16 dredging days

Justification for Dredging: The navigation channel is reduced to 160 feet between the 9.0’ contours and closed between the 10.5’ contours.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Homer

Location: 6-720.5 RMP

Site Characteristics: The Homer placement site is a historically used stockpile site. 

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a Channel Maintenance Coordinator at (651) 290-5155.