Corps celebrates the completion of a Mississippi River environmental project
The U.S. Army Corps of Engineers, St. Paul District, will celebrate the completion of the Pool 2 wing dam modification project with a ribbon cutting ceremony on July 25, at Lock and Dam 2 in Hastings, Minnesota, at 1 p.m. Lock and Dam 2 is located at 1350 Lock and Dam Road.

Download Image: Full Size (0.43 MB)
Photo by: Melanie Peterson |  VIRIN: 230711-A-AB038-1001.JPG

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil