Sandbagging at Lock and Dam 3
Lock and dam staff from the St. Paul District volunteered to come to Lock and Dam 3, near Welch, Minnesota, to help prepare sandbags for spring flooding. Staff borrowed the machine to fill sandbags from the nearby Xcel energy nuclear power plant.

Download Image: Full Size (4.8 MB)
Tags:
Photo by: Melanie Peterson |  VIRIN: 200310-A-AB038-413.JPG

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil