Tow rail installation
The new tow rail is installed at Lock and Dam 6 in Trempealeau, Wis., as part of the tow rail rehabilitation project . The tow rail is a vital piece of equipment which assists tows locking through locks and dams when traveling upriver.

Download Image: Full Size (2.5 MB)
Photo by: Anthony Horacek |  VIRIN: 200224-A-A1415-011.JPG

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil