A river rerouted: Step 1 in the Marsh Lake ecosystem restoration project
The St. Paul District, along with the Minnesota Department of Natural Resources and the Upper Minnesota Watershed District, oversaw the rerouting of the Pomme de Terre River, near Ortonville, Minnesota, on Oct. 1. Immediately following removal of the embankment, staff from Corps of Engineers and Minnesota DNR began relocating mussels impacted by the river restoration.

Download Image: Full Size (3.52 MB)
Photo by: Dan Kelner |  VIRIN: 181002-A-CE999-511.JPG

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil