180109-A-CE999-001
River ice at Lock & Dam 8 in Genoa, Wisconsin, the morning of Jan. 9, 2018. With the lock closed for the season crews have been preparing the site for guidewall crib repairs, an operation that requires divers guide pumped-concrete underwater to reinforce the structures that guide tows into the lock.

Download Image: Full Size (2.93 MB)
Photo by: Anthony Hornacek |  VIRIN: 180109-A-CE999-001.JPG

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil