Lock and Dam 5A dewatering
Kris Taverna, left, and Dale Rud, both of operations, work to remove damaged concrete from the lockwall at Lock and Dam 5A on January 15, 2015. Lock 5A was closed to navigation on Dec. 1, 2014, in order to complete the necessary work by March 9, 2015.

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil