Baldhill Dam periodic inspection
High and dry! You don’t see this that very often. Outflows from Baldhill Dam, near Valley City, N.D., were cut from 850 cubic feet per second to 13 cfs so that inspectors could complete a periodic inspection of the structure this week. The Corps’ comprehensive periodic inspections are performed every five years as part of its dam safety program. Routine or annual inspections are conducted at the site each year but do not involve dewatering the stilling basin. http://bit.ly/18MlfbO

Download Image: Full Size (0.82 MB)
Tags: Baldhill Dam
Photo by: Rich Schueneman |  VIRIN: 130820-A-CE999-901.JPG

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil