Lock and Dam 3
Looking upstream of Lock and Dam 3, the bend leading into the navigation structure is clearly visible. Part of a recent construction project to was extended upstream guidewall. Along withother related channel and streambank work greatly improves channel characteristics for approaching navigation tows. A ribbon cutting ceremony is held at Lock and Dam 3 in Welch, Minn., May 31, 2013. The event signified the completion of the nearly $70 million dollar project that significantly improves the navigational safety of boats entering the lock.

Download Image: Full Size (10 MB)
Tags: navigation
Photo by: U.S. Army Corps of Engineers |  VIRIN: 121113-A-CE999-501.JPG

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil