WEBVTT 00:00.009 --> 00:02.231 My name is Scott Ticky . I'm the , uh , 00:02.231 --> 00:04.342 the North Dakota section supervisor , 00:04.342 --> 00:06.676 basically the site manager for Homi Dam . 00:06.676 --> 00:08.842 We are doing our periodic inspection , 00:08.842 --> 00:11.065 which happens every 5 years . We , we , 00:11.065 --> 00:13.287 we go through all the components of the 00:13.287 --> 00:15.176 dam . We have a multidisciplinary 00:15.176 --> 00:15.149 engineering team that comes out in our 00:15.149 --> 00:17.350 operations folks , and we look at all 00:17.350 --> 00:19.461 the different components of the dam . 00:19.461 --> 00:21.461 Make up the dam , the , the control 00:21.461 --> 00:23.350 structure , the embankments , the 00:23.350 --> 00:25.017 spillways , look at all those 00:25.017 --> 00:27.128 components , see what my role as as a 00:27.128 --> 00:29.389 site supervisor is to kind of 00:29.389 --> 00:31.500 facilitate everything that's going on 00:31.500 --> 00:33.750 here , um , to help be the on-site 00:33.750 --> 00:35.869 safety folks for the engineering team 00:35.869 --> 00:37.869 that's not here every day . We make 00:37.869 --> 00:39.813 sure that that everything's open , 00:39.813 --> 00:42.189 ready and prepared for our inspection 00:42.189 --> 00:43.220 team to do their work .