WEBVTT 00:04.220 --> 00:06.550 My name is Hunter Simonson . I'm a park 00:06.550 --> 00:08.850 ranger with the US Army Corps of 00:08.850 --> 00:10.850 Engineers at the Sandy Lake Dam and 00:10.850 --> 00:13.590 Recreation area . So , in february of 00:13.590 --> 00:16.390 2021 we started the Sandy Lake Dam 00:16.390 --> 00:19.120 rehabilitation project . Uh This 00:19.120 --> 00:22.830 project consisted of two phases um to 00:22.830 --> 00:25.210 help make some significant repairs to 00:25.210 --> 00:27.520 the dam . Some of those improvements 00:27.520 --> 00:31.110 included new slide gates , new 00:31.110 --> 00:34.380 concrete repairs . Um the old timber 00:34.380 --> 00:37.030 apron on the upstream side was ripped 00:37.030 --> 00:40.160 out and replaced with concrete . And 00:40.160 --> 00:42.770 then we also had our old stop log bay 00:42.780 --> 00:46.490 get transformed into a new dual leaf 00:46.500 --> 00:49.950 gate as well . The main reason for the 00:49.950 --> 00:53.120 improvements was ultimately for public 00:53.120 --> 00:55.176 safety . Some of the concrete on the 00:55.176 --> 00:57.650 dam was starting to deteriorate and 00:57.650 --> 00:59.650 some of the operating equipment was 00:59.650 --> 01:01.928 starting to get to the end of its life . 01:01.970 --> 01:05.440 Um So these upgrades were to 01:05.450 --> 01:08.170 provide the structure and integrity of 01:08.170 --> 01:10.730 the dam for many years to come . So the 01:10.730 --> 01:12.830 big takeaway behind this is that the 01:12.840 --> 01:15.062 construction on the dam is now complete 01:15.062 --> 01:17.420 and we're excited to be open again this 01:17.420 --> 01:19.580 spring for camping .