Dredging Notice 15-35 Peterson's Bar

Published Sept. 28, 2015

DN 15-35                                           DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: September 28th, 2015                     DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                 MEETING TIME:

BOAT REQUIREMENT:                                          MEETING LOCATION:

 

DREDGE CUT NAME: Petersons Bar                     RIVER MILE: MN River 11.8 – 12.6

 

HISTORIC DATA

Frequency: 60%                                              Avg. Quantity/Job: 18,429 yd3

Last Date Dredged: Sept 27th, 2013               Avg. Quantity/Year: 11,058 yd3

 

SURVEY DATA

Date Surveyed: September 24th, 2015 

Water Surface Elevation: 687.7

Low Control Pool Elevation: 686.8

Net Difference: +0.9’

5 Day River Forecast: Steady Decline

 

DREDGING DATA

Recommended Channel Width: 100 feet

Recommended Dredging Depth: Cuts 1 & 2: 11 feet, Cuts 3, 4 & 5: 12 feet

Estimated Quantity: 20,149 yd3

Type of Dredge: Contract Mechanical

Proposed Dredging Date: September 30th, 2015

Estimated Duration: 10 dredging days

Justification for Dredging:  The navigation channel is closed to the 10.5’ contours.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Cargill East River

Location: MN-14.1-RMP

Site Characteristics: This is an upland beneficial use stockpile site provided to the Corps by the Lower MN River Watershed District. 

 

If you have any questions concerning this project or want to request an on‑site meeting please call me at (651) 324-2050.

 

 

 


Dredging Notice 15-35 Peterson's Bar

Published Sept. 28, 2015

DN 15-35                                           DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: September 28th, 2015                     DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                 MEETING TIME:

BOAT REQUIREMENT:                                          MEETING LOCATION:

 

DREDGE CUT NAME: Petersons Bar                     RIVER MILE: MN River 11.8 – 12.6

 

HISTORIC DATA

Frequency: 60%                                              Avg. Quantity/Job: 18,429 yd3

Last Date Dredged: Sept 27th, 2013               Avg. Quantity/Year: 11,058 yd3

 

SURVEY DATA

Date Surveyed: September 24th, 2015 

Water Surface Elevation: 687.7

Low Control Pool Elevation: 686.8

Net Difference: +0.9’

5 Day River Forecast: Steady Decline

 

DREDGING DATA

Recommended Channel Width: 100 feet

Recommended Dredging Depth: Cuts 1 & 2: 11 feet, Cuts 3, 4 & 5: 12 feet

Estimated Quantity: 20,149 yd3

Type of Dredge: Contract Mechanical

Proposed Dredging Date: September 30th, 2015

Estimated Duration: 10 dredging days

Justification for Dredging:  The navigation channel is closed to the 10.5’ contours.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Cargill East River

Location: MN-14.1-RMP

Site Characteristics: This is an upland beneficial use stockpile site provided to the Corps by the Lower MN River Watershed District. 

 

If you have any questions concerning this project or want to request an on‑site meeting please call me at (651) 324-2050.