DN 19-44                                           DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: September 16th, 2019                     DREDGING CATEGORY:  Imminent  MEETING DATE: If requested                            MEETING TIME:

BOAT REQUIREMENT:                                          MEETING LOCATION:

DREDGE CUT NAME: Blacksmith Slough             RIVER MILE: 718.9 – 719.3

 

HISTORIC DATA

Frequency: 19%                                              Avg. Quantity/Job: 18,606 yd3

Last Date Dredged: September 18th, 2018     Avg. Quantity/Year: 3,607 yd3

 

SURVEY DATA

Date Surveyed: September 10th, 2019

Water Surface Elevation: 644.4

Low Control Pool Elevation: 644.2

Net Difference: +0.2’

5-Day River Forecast: Slow Increase

 

DREDGING DATA

Recommended Channel Width: 300 feet

Recommended Dredging Depth: 12 feet

Estimated Quantity: 23,263 yd3

Type of Dredge: Contract Mechanical Plant 1

Actual Dredging Date: September 16th, 2019

Estimated Duration: 12 dredging days

Justification for Dredging: The navigation channel is reduced to 220’ between the 9.0’ contours and 120’ between the 10.5’ contours.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Winona Technology Park and Homer

Location: 6-722.9-RMP and 6-720.5-RMP

Site Characteristics:  Winona Technology Park is a site provided by the Winona Port Authority.  The Winona Port Authority has obtained all necessary permits for this action. The East End Boat Harbor (RM 723.6) is the offload site and material is trucked to Technology Park.

 

Homer is a historically used beneficial use placement site.

 

Our hope is to only use Winona Technology Park but Homer is listed here in case the water comes up too high to offload at the East End Boat Harbor.

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155.

 

 

 


Dredge Notice 19-44 Blacksmith Slough

Published Sept. 16, 2019

DN 19-44                                           DREDGING NOTICE

                                              U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: September 16th, 2019                     DREDGING CATEGORY:  Imminent  MEETING DATE: If requested                            MEETING TIME:

BOAT REQUIREMENT:                                          MEETING LOCATION:

DREDGE CUT NAME: Blacksmith Slough             RIVER MILE: 718.9 – 719.3

 

HISTORIC DATA

Frequency: 19%                                              Avg. Quantity/Job: 18,606 yd3

Last Date Dredged: September 18th, 2018     Avg. Quantity/Year: 3,607 yd3

 

SURVEY DATA

Date Surveyed: September 10th, 2019

Water Surface Elevation: 644.4

Low Control Pool Elevation: 644.2

Net Difference: +0.2’

5-Day River Forecast: Slow Increase

 

DREDGING DATA

Recommended Channel Width: 300 feet

Recommended Dredging Depth: 12 feet

Estimated Quantity: 23,263 yd3

Type of Dredge: Contract Mechanical Plant 1

Actual Dredging Date: September 16th, 2019

Estimated Duration: 12 dredging days

Justification for Dredging: The navigation channel is reduced to 220’ between the 9.0’ contours and 120’ between the 10.5’ contours.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Winona Technology Park and Homer

Location: 6-722.9-RMP and 6-720.5-RMP

Site Characteristics:  Winona Technology Park is a site provided by the Winona Port Authority.  The Winona Port Authority has obtained all necessary permits for this action. The East End Boat Harbor (RM 723.6) is the offload site and material is trucked to Technology Park.

 

Homer is a historically used beneficial use placement site.

 

Our hope is to only use Winona Technology Park but Homer is listed here in case the water comes up too high to offload at the East End Boat Harbor.

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please call a dredging manager at (651) 290-5155.