Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil 

 

Results:
Category: Red River of the North
Clear
  • Corps will conduct inspections of Orwell Dam

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, will conduct a periodic inspection at its Orwell Dam, located on the Otter Tail River near Fergus Falls, Minnesota, Nov. 4-6.
  • Corps to contract for construction of I-29 grade raise for Fargo-Moorhead diversion project

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is beginning the contracting process for construction of a raise of I-29, where it crosses the southern embankment of the Fargo, North Dakota/Moorhead, Minnesota, Metropolitan Area Flood Risk Management Project.
  • Corps to conduct geomorphic surveys in the Fargo-Moorhead area

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, in cooperation with the Flood Diversion Authority, is conducting geomorphic field surveys alongside the Red River of the North tributaries near Fargo, North Dakota, and Moorhead, Minnesota, starting tomorrow, Aug. 11
  • Corps releases draft master plan for two eastern North Dakota reservoirs

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, is seeking comments on the draft master plan and environmental assessment for Lake Ashtabula, near Valley City, North Dakota, and Homme Reservoir, near Park River, North Dakota.
  • Water quality sampling to resume for Fargo-Moorhead project

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, in cooperation with the Flood Diversion Board of Authority, will continue its water quality field surveys for the Fargo-Moorhead flood diversion project starting this week.
  • Corps begins spring drawdowns in the Red River of the North basin

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, is lowering its reservoir elevations within the Red River of the North basin based on recent snow measurements to prepare for potential spring snowmelt.
  • Fargo-Moorhead diversion project receives $100 million in Corps work plan

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, received $100 million to continue work on the Fargo-Moorhead Metropolitan Flood Risk Management Project in the U.S. Army Corps of Engineers Fiscal Year 2020 Work Plan released yesterday.
  • Corps awards its second contract for Fargo-Moorhead diversion project

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, awarded a $59,448,550.00 contract to Ames Construction, Inc. of Burnsville, Minnesota, to complete the Wild Rice River structure portion of the Fargo, North Dakota/Moorhead, Minnesota, Metropolitan Area Flood Risk Management Project, late Nov. 27, 2019.
  • Corps of Engineers to host public scoping meetings on recreation sites

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is hosting three public scoping meetings to garner input on how our reservoirs in western Minnesota and eastern South Dakota are managed for recreation and environmental stewardship.
  • Corps increases Baldhill Dam releases

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is increasing releases from Baldhill Dam, near Valley City, North Dakota, today to 3,100 cubic feet per second, or cfs, as Lake Ashtabula’s level continues to rise.