| Projects & Studies
|
| »
|
General Investigations: FERC Licensing
|
| »
|
Dam Bridge and Gate Painting: Upper St. Anthony Falls through Lock and Dam 10
|
| »
|
East Two Rivers at Tower, Minnesota
|
| »
|
Effects of Recreational Boating on the Upper Mississippi River System
|
| »
|
Hydropower, Crown Hydro, Minneapolis, Minnesota
|
| »
|
Hydropower, Ford Plant, Minneapolis, Minnesota
|
| »
|
Hydropower, Lock and Dam 2, Hastings, Minnesota
|
| »
|
Hydropower, Lower St. Anthony Falls Hydro, Minneapolis
|
| »
|
Hydropower, Upper St. Anthony Falls, Minneapolis
|
| »
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
| »
|
Lock & Dam 10 Stage 2
|
| »
|
Lock Tow Haulage Units
|
| »
|
Lock and Dam 4 Embankment Environmental Assessment
|
| »
|
Locks and Dams 2 - 10, Embankment Maintenance Study
|
| »
|
Lower Pool 4 Channel and Dredged Material Management Study
|
| »
|
McMillan Island, Mississippi River Channel Maintenance
|
| »
|
Minnesota River Navigation Project
|
| »
|
Mississippi Headwaters Reservoirs Dam Safety Issues
|
| »
|
Mississippi Headwaters Reservoirs Project Sites
|
| »
|
Mississippi River Locks and Dams Nos. 2-10 Embankment Rehabilitation
|
| »
|
Mississippi River Major Maintenance / Rehabilitation
|
| »
|
Mississippi River: Lock & Dam 3 Navigation Safety and Embankments, Minnesota and Wisconsin
|
| »
|
Navigation and Environmental Sustainability Program (NESP)
|
| »
|
Navigation, Mississippi River, Lock Bulkheads and Slot Installation (Minnesota/Wisconsin/Iowa)
|
| »
|
Navigation: Mississippi River Project – American Recovery and Reinvestment Act Funded Projects, Minnesota/Wisconsin/Iowa
|
| »
|
Operation and Maintenance, Lock and Dam 10 Stage 2
|
| »
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
| »
|
Recreational Boating Study of the Mississippi River, Pools 4 to 9, Summer 2003
|
| »
|
River Resource Values and Expectation
|
| »
|
Small-Boat Harbor Dredging, St. Paul, Minnesota (Harbor Dredging)
|
| »
|
St. Croix River: Endangered Mussel Conservation - Zebra Mussel Control
|
| »
|
Upper Mississippi River - Illinois Waterway System Navigation Study
|
| »
|
Upper Mississippi River 9-Foot Project - Locks & Dams
|
| »
|
Upper Mississippi River 9-Foot Project Channel Maintenance; Minnesota, Wisconsin, Iowa
|
| »
|
Warroad Harbor and River Harbor Dredging
|
|
|
|
Mississippi River Environmental Pool Plans
The Environmental Pool Plans were prepared by the Fish and Wildlife Work Group at the request of the River Resources Forum (Forum). The planning area includes the Mississippi River from the head of navigation at Minneapolis, Minnesota to Lock and Dam No. 10 at Guttenberg, Iowa. Environmental pool plans are maps and descriptions of what river managers and the public have identified as the habitat and features necessary to reverse negative trends in habitat quality and move towards a more sustainable ecosystem. The plans for Pools 2 through 10 are endorsed by the Forum and have become guidelines for future programs and projects for river management. The Forum and its agency partners see general public understanding and acceptance of the plans to be vital for cooperative river management.
|
Knowledge about river management tools, such as water level management, island stabilization and creation, backwater dredging, and channel modifications, has increased greatly over the last decade. The environmental pool plans will provide the guidelines for applying these tools and others in coordinated river management efforts.
- Environmental Pool Plans Report
The public is encouraged to download the document, review, and forward comments on desired future conditions as well as specific projects to achieve those conditions.
|
Managing Agency Contacts:
- U. S. Fish and Wildlife Service:
Pools 4-5A Mary Stefanski, 507-454-6229
Pools 7-8, Jim Nissen, 608-783-8404
Pools 9-11, Tim Yager, 563-873-3423
-
U. S. Army Corps of Engineers: Randy Urich, 507-895-6341
- Iowa Department of Natural Resources: Scott Gritters, 319-252-1156
- Minnesota Department of Natural Resources: Tim Schlagenhaft, 507-280-5058
- Wisconsin Department of Natural Resources: Jeff Janvrin, 608-785-9005
- Fish and Wildlife Work Group Chairman: Dennis Anderson, 651-290-5272
|
Please address comments and questions to
Randy Urich
U.S. Army Corps of Engineers
Natural Resource Project
1114 So. Oak St.
La Crescent, MN 55947-1560
(507) 895-6341
randall.r.urich@usace.army.mil
|
|
|
[Printable Copy]
|