| Projects & Studies
|
| »
|
Benton County near St. Cloud, Minnesota
|
| »
|
Canisteo Mine Pit Flood Control Project, Itasca County, Minn.
|
| »
|
Chippewa River at Big Bend , Minnesota - Stream Bank Protection
|
| »
|
Crow River at Delano, Minnesota
|
| »
|
Devils Lake Basin, North Dakota
|
| »
|
Devils Lake Levee, N.D.
|
| »
|
Devils Lake, N.D., Flood Risk Management Project
|
| »
|
Devils Lake: Minnewaukan Flood Control Project, North Dakota
|
| »
|
Drayton Initial Assessment - Drayton, North Dakota
|
| »
|
Eau Galle Lake
|
| »
|
Emergency Streambank Protection, Section 14, Brooklyn Center, Minn.
|
| »
|
Erosion along Highway 2, Red Lake River, Crookston, MN
|
| »
|
Fargo-Moorhead and Upstream Feasibility Study
|
| »
|
Flood Control: Downtown St. Paul Airport, St. Paul, Minnesota
|
| »
|
Flood Risk Management Continuing Authority, Red River of the North: Wahpeton, N.D.
|
| »
|
Flood Risk Management: Fargo-Moorhead Metro, North Dakota and Minnesota
|
| »
|
Flood Risk Management: Red Lake River, Crookston, Minnesota
|
| »
|
Flood Risk Management: Red River of the North at Grand Forks, North Dakota/East Grand Forks, Minnesota
|
| »
|
Flood Risk Management: Roseau River, Roseau, Minn.
|
| »
|
Flood Risk Management: Sheyenne River, West Fargo, N.D.
|
| »
|
Flood Risk Management: Twin Valley, Wild Rice River, Minn.
|
| »
|
Hay Creek Aquatic Ecosystem Restoration - Roseau County, Minnesota
|
| »
|
Homme Dam and Reservoir Dam Safety, N.D.
|
| »
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
| »
|
Kickapoo River Flood Damage Reduction, La Farge, Wisconsin
|
| »
|
Lac Qui Parle River, Dawson, Minn.
|
| »
|
Marsh Creek near Mahnomen, Minnesota
|
| »
|
Minnesota River Flood Control Project : Montevideo, Minnesota
|
| »
|
Minnesota River Flood Risk Management Project, Granite Falls, Minn.
|
| »
|
Mississippi Headwaters Reservoirs Project Sites
|
| »
|
Mississippi River Discharge-Frequency Study
|
| »
|
Newport, Minn., Flood Risk Management Project, Section 205
|
| »
|
Painter Creek Habitat Restoration, Minnehaha Creek, Minnesota
|
| »
|
Park River Flood Protection Project at Grafton, N.D.
|
| »
|
Pembina River Flood Control Project: Neche, North Dakota
|
| »
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
| »
|
Red River of the North Basin: Basin-Wide Watershed Management Planning
|
| »
|
Red River of the North Basin: Minnesota, North Dakota, South Dakota and Manitoba, Reconnaissance Study
|
| »
|
Red River of the North Flood Control: Breckenridge, Minn.
|
| »
|
Ridgewood Addition, Fargo, North Dakota
|
| »
|
River Resource Values and Expectation
|
| »
|
Roads Serving As Water Barriers, Devils Lake Basin, North Dakota
|
| »
|
Sand Creek Flood Risk Management Project, Jordan, Minnesota
|
| »
|
Section 205 Flood Control Project, Borup, Minnesota
|
| »
|
Section 205 Flood Control Study: Mississippi River, Aitkin, Minnesota
|
| »
|
Sheyenne River, Baldhill Pool Raise, North Dakota
|
| »
|
Souris River, Minot and Ward County, North Dakota
|
| »
|
South Fork Zumbro River Flood Control: Rochester, Minnesota
|
| »
|
South Washington Watershed District
|
| »
|
Stillwater Flood and Retaining Wall Project, St. Croix River, Stillwater, Minn.
|
| »
|
Stream Bank Protection: Section 14, Pug Hole Lake, Minnesota
|
| »
|
Streambank Protection: Section 14, Fort Abercrombie, N.D.
|
| »
|
Streambank Protection: Section 14, Ho-Chunk Nation Bison Farm, Wisconsin River, Richland County, Wisconsin
|
| »
|
Western Flood Control Sites - Minnesota: Lake Traverse, Orwell Lake, Highway 75-Bigstone, Lac qui Parle
|
| »
|
Western Flood Control Sites – North Dakota: Lake Ashtabula, Homme Lake Souris River
|
| »
|
White Rock Dam Safety, Wheaton, Minn.
|
| »
|
Wild Rice River, Minn, Feasibility Study
|
| »
|
Wild Rice and Marsh Rivers, Ada, Minnesota
|
|
|
|
Flood Risk Management: Red River of the North at Grand Forks, North Dakota/East Grand Forks, Minnesota
|
Location/Description
|
The cities of Grand Forks, N.D., and East Grand Forks, Minn., are located at the confluence of the Red River of the North and the Red Lake River, approximately 90 miles south of the Canadian border. Their combined population is nearly 60,000.
|
|
Status
|
Construction is complete to the 250-year level of protection (equivalent to the peak discharge experienced during the 1997 flood). On January 26, 2007, the Corps certified that the majority of the project was substantially complete and functional to a 100-year level of protection. The Point area was certified to the 100-year level in July 2007. Shortly after each certification, the Federal Emergency Management Agency, or FEMA, issued Letters of Map Revision to the existing Flood Insurance Maps to reflect the protection provided by the levees and floodwalls. Project closeout remains to be completed.
|
|
Additional
|
The project consists of 30 miles of levees and 3 miles of floodwall set back from the river, forming three "rings" around both communities. Also included are two diversion channels, 23 pump stations, 24 miles of recreational trails and seven trailheads.
|
|
Authority
|
The project was authorized in the Omnibus Appropriations Act of 1999 (Public Law 105-277).
|
|
Fiscal
|
Project design and construction costs are shared between federal and non-federal (the two cities) interests. The non-federal cost share varies from a minimum of 35 percent to a maximum of 50 percent, depending on the cost of the real estate. Operation and maintenance costs are a 100-percent non-federal responsibility. For fiscal year 2007, the project received $15.1 million in Federal funding. Additional funding to complete remaining work prior to final project turnover is being pursued by the non-federal sponsor for fiscal year 2010.
|
| Estimated federal cost |
$227,050,000 |
| Estimated non-federal cost |
$185,401,000 |
| Total estimated project cost |
$412,451,000 |
|
|
|
[Printable Copy]
|