DN 16-20                                            DREDGING NOTICE

                                               U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: August 5th, 2016                            DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                  MEETING TIME:

BOAT REQUIREMENT:                                           MEETING LOCATION:

DREDGE CUT NAME: Fisher Island                        RIVER MILE: 744.9 – 745.3

 

HISTORIC DATA

Frequency: 78 %                                            Avg. Quantity/Job: 44,887 yd3

Date Last Dredged: May 6th, 2015                 Avg. Quantity/Year: 35,129 yd3

 

SURVEY DATA

Date Surveyed: August 2nd, 2016

Water Surface Elevation: 660.6

Low Control Pool Elevation: 659.4

Net Difference: +1.2

5-Day River Forecast: Steady Decline

 

DREDGING DATA

Recommended Channel Width: 500 feet

Recommended Dredging Depth: 12 feet

Estimated Quantity: 50,585 yd3

Type of Dredge: Government Hydraulic

Proposed Dredging Date: August 7th, 2016

Estimated Duration: 7 dredging days

Justification for Dredging: The navigation channel is reduced to 240’ between the 9’ contours and closed between the the 10.5’ contours. On a recommended bend width of 500’.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Above Fisher Island

Location: 5-745.8-RMT

Site Characteristics: This is a historically used island transfer site.

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please contact the Channel Maintenance Coordinator at 651-290-5155.

 

 

 

 

 

Dredge Notice 16-20 Fisher Island

Published Aug. 5, 2016

DN 16-20                                            DREDGING NOTICE

                                               U.S. ARMY CORPS OF ENGINEERS

                                                            ST. PAUL DISTRICT

 

NOTICE DATE: August 5th, 2016                            DREDGING CATEGORY: Imminent

MEETING DATE: If requested                                  MEETING TIME:

BOAT REQUIREMENT:                                           MEETING LOCATION:

DREDGE CUT NAME: Fisher Island                        RIVER MILE: 744.9 – 745.3

 

HISTORIC DATA

Frequency: 78 %                                            Avg. Quantity/Job: 44,887 yd3

Date Last Dredged: May 6th, 2015                 Avg. Quantity/Year: 35,129 yd3

 

SURVEY DATA

Date Surveyed: August 2nd, 2016

Water Surface Elevation: 660.6

Low Control Pool Elevation: 659.4

Net Difference: +1.2

5-Day River Forecast: Steady Decline

 

DREDGING DATA

Recommended Channel Width: 500 feet

Recommended Dredging Depth: 12 feet

Estimated Quantity: 50,585 yd3

Type of Dredge: Government Hydraulic

Proposed Dredging Date: August 7th, 2016

Estimated Duration: 7 dredging days

Justification for Dredging: The navigation channel is reduced to 240’ between the 9’ contours and closed between the the 10.5’ contours. On a recommended bend width of 500’.

 

MATERIAL PLACEMENT DATA

Proposed Placement Site: Above Fisher Island

Location: 5-745.8-RMT

Site Characteristics: This is a historically used island transfer site.

 

If you have any questions concerning this project, or if you would like to request an on‑site meeting, please contact the Channel Maintenance Coordinator at 651-290-5155.