Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
332 Minnesota St., Suite E1500
St. Paul, MN 55101

Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil 

 

Corps awards a $67 million contract for the Fargo-Moorhead diversion project

U.S. Army Corps of Engineers, St. Paul District
Published April 9, 2021

The U.S. Army Corps of Engineers, St. Paul District, awarded a $67 million contract to Industrial Builders Incorporated of West Fargo, North Dakota, to complete the Interstate 29 grade raise portion of the Fargo, North Dakota / Moorhead, Minnesota, Metropolitan Area Flood Risk Management Project, April 9.

This project consists of a grade raise of I-29 for approximately 4 miles to bring the roadway out of the 500-year flood elevation. The project extends from south of Exit 50 (Hickson Interchange) to north of Exit 54 (Davenport/Oxbow Interchange) and includes an up and-over where I-29 crosses the southern embankment near the Wild Rice River, bridge construction and replacement, a temporary by-pass, as well as work on adjacent county roads 18 and 81 in the vicinity of Oxbow.

This congressionally authorized project is a 30-mile long diversion channel in North Dakota with upstream staging. The plan includes a 21-mile long southern embankment, 19 highway bridges, three railroad bridges, three gated control structures and two aqueduct structures.

The Corps is working in partnership on this project with the cities of Fargo and Moorhead and the Metro Flood Diversion Authority. This project provides flood risk reduction for more than 230,000 people and 70 square miles of infrastructure in the communities of Fargo, Moorhead, West Fargo, Horace and Harwood.

– 30 – 


Contact
Public Affairs

Release no. 21-037