Home > Media > News Releases

Contact Public Affairs

U.S. Army Corps of Engineers
St. Paul District
Public Affairs Office
180 5th St. E., Suite 700
St. Paul, MN 55101
Phone: (651) 290-5807
Fax: (651) 290-5752
cemvp-pa@usace.army.mil 
Aerial image of Upper St. Anthony Falls Lock and Dam

1 2 3 4 5 6 7 8 9 10 ... 57

Corps of Engineers set to dredge Winona, Minn., boat harbor

ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, plans to dredge the Winona, Minnesota, Small Boat Harbor, also known as Dick’s Marine, beginning Sept.12. [Read More]
Published: Sep-07-17

Corps changes operations at Lock and Dam 8 to deter Asian carp invasion

ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, recently changed how it operates Lock and Dam 8 on the Mississippi River in Genoa, Wisconsin, in an effort to impede the upstream movement of Asian carp. [Read More]
Published: Aug-30-17

Corps makes decision to proceed with disposition study of Minneapolis locks

ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, will begin a disposition study for its three Mississippi River locks in Minneapolis, Minnesota. [Read More]
Published: Aug-28-17

Corps urges those on the water this Labor Day holiday to wear life jackets

ST. PAUL, Minn. – As many folks celebrate the final weeks of summer and transition to fall activities, the U.S. Army Corps of Engineers, St. Paul District, wants to remind folks to take an extra moment to ensure that they are safe while out on the water. [Read More]
Published: Aug-28-17

Water releases increased at Lac Qui Parle Dam

ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, increased the outflow from its Lac Qui Parle Dam, located on the Minnesota River in west-central Minnesota, from 550 cubic feet per second, or cfs, to 2,500 cfs, Aug. 17. [Read More]
Published: Aug-17-17

Corps extends comment period for dredged material management plan

ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is extending the comment period its draft Environmental Assessment for its Lower Pool 4 dredged material management plan. The new deadline is Aug. 25. [Read More]
Published: Jul-28-17

Corps grants additional extension for its dredged material management plan

ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is again extending the public comment period for its draft Environmental Assessment for its Lower Pool 4 dredged material management plan. The new deadline is now July 28. [Read More]
Published: Jul-14-17

Corps seeks comments on final Mouse River flood protection project environmental impact statement

ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, posted the final Mouse River Enhanced Flood Protection Project Environmental Impact Statement, or final EIS, to its website today, July 13. [Read More]
Published: Jul-13-17

Corps of Engineers plans brief outflow reduction at Baldhill Dam

ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is reducing outflows into the Sheyenne River at Baldhill Dam, located northwest of Valley City, North Dakota, to approximately 100 cubic feet per second, or cfs, beginning Monday, July 17. [Read More]
Published: Jul-10-17

Bad Axe Landing river access temporarily closing

ST. PAUL, Minn. – The boat landing, located south of Genoa, Wis., on Bad Axe River, will be closed starting Monday, July 3, for public safety as Burlington Northern Santa Fe replaces the east approach to the railroad bridge as part of its ongoing maintenance and replacement project. [Read More]
Published: Jun-30-17
1 2 3 4 5 6 7 8 9 10 ... 57