US Army Corps of Engineers
St. Paul District Website

This page is not being updated

 

Souris River, North Dakota

Souris River plotLake Darling inflow, outflow and elevation plot and forecast 

June 12, 2013
Lake Darling Update:
 Inflow to Lake Darling is estimated at 1,250 cubic feet per second, or cfs, and increasing. Outflow is at 1,250 cfs. Outflows will be held here for the next few weeks.Current pool elevation is 1,597.2 feet and steady. Target pool elevation is 1,597 feet.

[View Plot]

These projections are the best available estimates of highly uncertain conditions. There is a high margin for error, and the user is cautioned to allow for this. The user assumes all risk related to its use of this data. The producer of this data is providing this data "as is," and provides no warranty, express or implied, regarding the data or its use, including (without limitation) any implied warranties of merchantability or fitness for a particular purpose. In no event will the producer of this data be liable to you or to any third party for any direct, indirect, incidental, consequential, special or exemplary damages or lost profit resulting from any use or misuse of this data.
Lake Darling Dam outflows at 320 cfs

Lake Darling Dam
Releasing 320 cfs on April 23, 2013

Souris River Related News Releases

Corps of Engineers seeks public comments on draft environmental documents
10/7/2019
The U.S. Army Corps of Engineers, St. Paul District, released a draft Supplemental Environmental Assessment Oct. 4, 2019 for proposed alterations to the existing levee system, as well as constructing...
Corps to host public meeting on Souris River Feasibility Study
11/9/2017
ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, and the Souris River Joint Water Resources Board, or SRJB, are holding a public meeting to discuss the draft Souris “Mouse” River...
Public feedback sought on proposed Minot flood risk management project
10/31/2017
The U.S. Army Corps of Engineers, St. Paul District, posted a copy of its draft Feasibility Report and Environmental Assessment, or EA, on the web today for the proposed Souris Basin, North Dakota,...
Corps seeks comments on final Mouse River flood protection project environmental impact statement
7/13/2017
ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, posted the final Mouse River Enhanced Flood Protection Project Environmental Impact Statement, or final EIS, to its website...
Corps solicits public feedback to Mouse River Enhanced Flood Protection Project environmental impact statement
4/13/2017
ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, seeks comments on an addendum to the draft Environmental Impact Statement, or draft EIS, for the proposed Mouse River Enhanced...