    Mississippi River Locks and Dams 2–10 Miter Gates Replacement

    Locks and Dams (LD) 2 through 10 have used the same miter gates since their construction in the 1930s. Over time, the gates have been damaged and distressed, which has led to serviceability and safety issues. This project will replace the gates and the anchorages system, increasing navigational longevity and operational readiness while decreasing repair costs and downtime due to maintenance or failure. Upper Mississippi Locks and Dams 2 through 10.
  • March

    Navigation and Ecosystem Sustainability Program (NESP)

    The Navigation and Ecosystem Sustainability Program (NESP), seeks to provide a safe, reliable, cost effective and environment sustainable waterborne navigation system by implementing switchboats at five locks, constructing mooring cells and seven new 1,200 foot locks. NESP will restore the aquatic and terrestrial habitat to a more natural condition on more than 100,000 acres throughout the system through a wide variety of ecosystem projects.