Official websites use .mil
Secure .mil websites use HTTPS
Flood Risk Management
Navigation
Environmental/Ecosystem
Recreation
Continuing Authorities Program (CAP)
Completed Projects
Upper Mississippi River Restoration Fact Sheets (UMRR)
Mississippi River
Minnesota River
Rainy River
Red River of the North
Souris River
Iowa
Minnesota
North Dakota
South Dakota
Wisconsin
Iowa - 1
Iowa - 4
Minnesota - 1
Minnesota - 2
Minnesota - 3
Minnesota - 4
Minnesota - 5
Minnesota - 6
Minnesota - 7
Minnesota - 8
Wisconsin - 2
Wisconsin - 3
Wisconsin - 6
Wisconsin - 7
U.S. Army Corps of Engineers St. Paul District Programs & Project Management 332 Minnesota St., Suite E1500 St. Paul, MN 55101
(651) 290-5755
cemvp-pm@usace.army.mil
The primary objective of this project is to protect, restore, or create resilient and diverse bottomland forests. The quality and extent of the unique forest and aquatic habitat in the Reno Bottoms project area has been declining over the past several decades. Human caused changes in hydrology, land use, and climate have increased water levels within the project area. Without action, the project area will continue to degrade. The quality of forest and aquatic habitat will decrease. Invasive grasses would expand into forests, limiting opportunities for smaller trees to grow and reducing habitat value. Additional loss of wetland habitat would adversely affect migrating waterbirds and songbirds who require the floodplain forest to stop and rest.
The 14,000-acre Reno Bottoms area is located within the Upper Mississippi River National Wildlife and Fish Refuge (refuge) in Houston County, Minnesota, and Allamakee County, Iowa, and is in Pool 9 between river miles 671‒682. The area is bounded on the west by the Canadian Pacific railroad, on the east by the main Mississippi River navigation channel, on the north by the Lock and Dam 8 dike and on the south by the Upper Iowa River. The closest communities to the project area are New Albin, Iowa, and Reno, Minnesota.
Identification and evaluation of potential solutions to address the problems at Reno Bottoms is underway. Some potential actions to improve habitat include: forest plantings, soil placement to raise forest elevations, invasive species control, shoreline protection, improvements to backwater habitats, and side channel closure structures to lower water levels.
The Corps began project planning in fiscal year 2019 and completed the feasibility report in fiscal year 2023. Design will commence in 2023 with a construction contract award anticipated in fiscal year 2025 subject to appropriations.
Congress originally authorized the Upper Mississippi River Restoration (UMRR) Program in Section 1103 of the 1986 Water Resources Development Act (WRDA) (Public Law 99‒662), codified at 33 U.S.C. § 652. Section 307 of WRDA 2020 (Public Law 116‒260) increased the authorized program funding to a combined $55 million annually.
Project design and construction costs will be 100% federal for the project is located on lands managed as a national wildlife refuge. Operation and maintenance costs will be the responsibility of the USFWS.
Federal Funds Allocated to Date $1,590,000 Estimated Construction Cost $39,000,000