Expiration date: 4/10/2020
THIS NOTICE HAS BEEN EXTENDED TO APRIL 10
The U.S. Army Corps of Engineers, St. Paul District, is seeking public input on its draft Mississippi River Pool 6 Dredged Material Management Plan. The draft plan outlines the transportation and land requirements to permanently place dredged material removed from the Mississippi River in Pool 6 for the next 20 years. Pool 6 is a 14.4-mile stretch of the river from Lock and Dam 5A, in Fountain City, Wisconsin, to Lock and Dam 6 in Trempealeau, Wisconsin.